XS series operating manualXS user manual v0.55 - 96 -Information on cycle timingMinimum cycle timing in dielectric strength test ( hipot test)Measurement conditions :Software revisionMeasurement display NO (second page of the setup menu)Interface PLCRise time 0Fall time 0Hold time 1Time AUTOOther parameters independent Test time = time between change of the MES_DCH (start test) signal and change of EOT (end oftest) signal = 980 mS Measurement parameters : same as above but with hold time = 0Test time = 700 mS. In this case there is no output voltage control. Measurement parameters : memory number change between each measurementTest time = basic minimum test time + 1.3 SMinimum cycle timing in MEGOHMMETERMeasurement conditions :Software revisionMeasurement display NO (second page of the setup menu)Interface PLCMeasurement time 0Other parameters independent Test time = time between change of the MES_DCH (start test) signal and change of EOT (end oftest) signal = 1.58 S Measurement parameters : memory number change between each measurementTest time = basic minimum test time + 1.3 SMinimum cycle timing in GROUND CONTINUITYMeasurement conditions :Software revisionMeasurement display NO (second page of the setup menu)Interface PLCRise time 0Fall time 0Hold time 1Time AUTO Test time = time between change of the MES_DCH (start test) signal and change of EOT (end of test)signal = 1.19 S Measurement parameters : memory number change between each measurementTest time = basic minimum test time + 1.3 S