Contents - September
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Specifications
- Performance Specifications
- Hydraulic Specification
- Hydraulic Component Specifications
- Machine Torque Specifications
- Hydraulic Hose and Fitting Torque Specifications
- Torque Procedure
- SAE and Metric Fasteners Torque Charts
- Repair Procedures
- Platform Controls
- Platform Components
- Platform Rotator
- Platform Overload System
- Jib Boom Components
- Jib Boom Bell Crank (models without rotating jib boom)
- Jib Boom Bell Crank (models with rotating jib boom)
- Jib Boom Lift Cylinder
- Primary Boom
- How to Disassemble the Primary Boom
- Primary Boom Lift Cylinder
- Primary Boom Extension Cylinder
- Platform Leveling Master Cylinder
- Secondary Boom Components
- Secondary Boom
- Secondary Boom Lift Cylinders
- Hydraulic Pump
- Manifolds
- Valve Adjustments - Function Manifold
- How to Adjust the Secondary Boom Down Relief Valve
- How to Adjust the Turntable Rotate Relief Valve
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- Valve Coils
- How to Test a Coil Diode
- Turntable Rotation Components
- Steer Axle Components
- Non-steer Axle Components
- Fault Code Charts
- Section 5 Schematics
- Electrical Symbol Legend
- Hydraulic Symbols Legend
- Limit Switch Location Legend
- Electrical Schematics – Options
- Power Cable Wiring Diagram
- Drive Contactor Panel Wiring Diagram
- Manifold and Limit Switch Wiring Diagram
- LVI/BCI Option Wiring Diagram
- Charger Interlock Option
- CTE Option, (CE Models)
- Hydraulic Schematics
- Hydraulic Schematic
- Electrical Schematics – ANSI / CSA / AS Models
- Electrical Schematic, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA / AS before serial numbers Z3010-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – ANSI and CSA Models
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – AS / CE Models
- Ground Control Box Terminal Strip Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (AS / CE), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
|
September 2015 Service and Repair ManualPlatform ComponentsPart No. 1268498 Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N 15Platform Co mpon ents2-1 Platform Lev eling Slav e Cyli nder2-1Platform Leveling Slave CylinderThe slave cylinder and the rotator pivot are the twoprimary supports for the platform. The slavecylinder keeps the platform level through the entirerange of boom motion. It operates in aclosed-circuit hydraulic loop with the mastercylinder. The slave cylinder is equipped withcounterbalance valves to prevent movement in theevent of a hydraulic line failure.How to Remove the PlatformLeveling Slave CylinderNote: Before cylinder removal is considered, bleedthe slave cylinder to be sure there is no air in theclosed loop.Note: When removing a hose assembly or fitting,the O-ring (if equipped) on the fitting and/or hoseend must be replaced. All connections must betorqued to specification during installation. Refer toSpecifications, Hydraulic Hose and Fitting TorqueSpecifications.1 Extend the boom until the slave cylinderbarrel-end pivot pin is accessible.2 Raise the boom slightly and place blocksunder the platform for support. Lower theboom until the platform is resting on theblocks.3 Tag and disconnect the hydraulic hoses to theslave cylinder at the union and connect themtogether with a connector. Cap the fittings onthe cylinder hoses.Bodily injury hazard. Sprayinghydraulic oil can penetrate andburn skin. Loosen hydraulicconnections very slowly to allowthe oil pressure to dissipategradually. Do not allow oil tosquirt or spray.4 Remove the external snap rings from therod-end pivot pin. Do not remove the pin.5 Remove the external snap rings from thebarrel-end pivot pin.6 Place a block of wood under the barrel of theslave cylinder for support.7 Use a soft metal drift to remove the rod-endpivot pin.Crushing hazard. The platformcould fall if not properlysupported.8 Use a soft metal drift to remove the barrel-endpivot pin.9 Carefully pull the cylinder with hydraulic hosesout of the boom.How to Bleed the Slave Cylinder1 Raise the jib boom to a horizontal position.2 Move the platform level toggle switch up anddown through two platform leveling cycles toremove any air that might be in the system.
PreviousNext |