Contents - September
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Specifications
- Performance Specifications
- Hydraulic Specification
- Hydraulic Component Specifications
- Machine Torque Specifications
- Hydraulic Hose and Fitting Torque Specifications
- Torque Procedure
- SAE and Metric Fasteners Torque Charts
- Repair Procedures
- Platform Controls
- Platform Components
- Platform Rotator
- Platform Overload System
- Jib Boom Components
- Jib Boom Bell Crank (models without rotating jib boom)
- Jib Boom Bell Crank (models with rotating jib boom)
- Jib Boom Lift Cylinder
- Primary Boom
- How to Disassemble the Primary Boom
- Primary Boom Lift Cylinder
- Primary Boom Extension Cylinder
- Platform Leveling Master Cylinder
- Secondary Boom Components
- Secondary Boom
- Secondary Boom Lift Cylinders
- Hydraulic Pump
- Manifolds
- Valve Adjustments - Function Manifold
- How to Adjust the Secondary Boom Down Relief Valve
- How to Adjust the Turntable Rotate Relief Valve
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- Valve Coils
- How to Test a Coil Diode
- Turntable Rotation Components
- Steer Axle Components
- Non-steer Axle Components
- Fault Code Charts
- Section 5 Schematics
- Electrical Symbol Legend
- Hydraulic Symbols Legend
- Limit Switch Location Legend
- Electrical Schematics – Options
- Power Cable Wiring Diagram
- Drive Contactor Panel Wiring Diagram
- Manifold and Limit Switch Wiring Diagram
- LVI/BCI Option Wiring Diagram
- Charger Interlock Option
- CTE Option, (CE Models)
- Hydraulic Schematics
- Hydraulic Schematic
- Electrical Schematics – ANSI / CSA / AS Models
- Electrical Schematic, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA / AS before serial numbers Z3010-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – ANSI and CSA Models
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – AS / CE Models
- Ground Control Box Terminal Strip Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (AS / CE), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
|
September 2015 Service and Repair ManualPrimary Boom ComponentsPart No. 1268498 Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N 334-5 Platform Lev eling M aster Cylinder4-5Platform Leveling MasterCylinderThe platform leveling master cylinder acts as apump for the slave cylinder. It is part of theclosed-loop hydraulic circuit that keeps theplatform level through the entire range of primaryboom motion. The platform leveling mastercylinder is located inside the upper mid-pivot at thepivot end of the primary boom.How to Remove the PlatformLeveling Master CylinderBodily injury hazard. Thisprocedure requires specific repairskills, lifting equipment and asuitable workshop. Attemptingthis procedure without theseskills and tools could result indeath or serious injury andsignificant component damage.Dealer service is stronglyrecommended.Note: When removing a hose assembly or fitting,the O-ring (if equipped) on the fitting and/or hoseend must be replaced. All connections must betorqued to specification during installation. Refer toSpecifications, Hydraulic Hose and Fitting TorqueSpecifications.1 Raise the secondary boom until both the rodend and barrel-end pivot pins of the mastercylinder are accessible.2 Tag, disconnect and plug the master cylinderhydraulic hoses. Cap the fittings on thecylinder.Bodily injury hazard. Sprayinghydraulic oil can penetrate andburn skin. Loosen hydraulicconnections very slowly to allowthe oil pressure to dissipategradually. Do not allow oil tosquirt or spray.3 Attach an overhead crane or similar liftingdevice to the master cylinder.4 Remove the pin retaining fasteners from themaster cylinder barrel-end pivot pin. Use asoft metal drift to remove the pin.Crushing hazard. The mastercylinder could becomeunbalanced and fall if notproperly attached to theoverhead crane.5 Remove the pin retaining fastener from therodend pivot pin.6 Place a rod through the rod-end pivot pin andtwist to remove the pin.7 Remove the master cylinder from themachine.Crushing hazard. The mastercylinder could becomeunbalanced and fall if notproperly attached to theoverhead crane.
PreviousNext |