Contents - September
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Specifications
- Performance Specifications
- Hydraulic Specification
- Hydraulic Component Specifications
- Machine Torque Specifications
- Hydraulic Hose and Fitting Torque Specifications
- Torque Procedure
- SAE and Metric Fasteners Torque Charts
- Repair Procedures
- Platform Controls
- Platform Components
- Platform Rotator
- Platform Overload System
- Jib Boom Components
- Jib Boom Bell Crank (models without rotating jib boom)
- Jib Boom Bell Crank (models with rotating jib boom)
- Jib Boom Lift Cylinder
- Primary Boom
- How to Disassemble the Primary Boom
- Primary Boom Lift Cylinder
- Primary Boom Extension Cylinder
- Platform Leveling Master Cylinder
- Secondary Boom Components
- Secondary Boom
- Secondary Boom Lift Cylinders
- Hydraulic Pump
- Manifolds
- Valve Adjustments - Function Manifold
- How to Adjust the Secondary Boom Down Relief Valve
- How to Adjust the Turntable Rotate Relief Valve
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- Valve Coils
- How to Test a Coil Diode
- Turntable Rotation Components
- Steer Axle Components
- Non-steer Axle Components
- Fault Code Charts
- Section 5 Schematics
- Electrical Symbol Legend
- Hydraulic Symbols Legend
- Limit Switch Location Legend
- Electrical Schematics – Options
- Power Cable Wiring Diagram
- Drive Contactor Panel Wiring Diagram
- Manifold and Limit Switch Wiring Diagram
- LVI/BCI Option Wiring Diagram
- Charger Interlock Option
- CTE Option, (CE Models)
- Hydraulic Schematics
- Hydraulic Schematic
- Electrical Schematics – ANSI / CSA / AS Models
- Electrical Schematic, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA / AS before serial numbers Z3010-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – ANSI and CSA Models
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – AS / CE Models
- Ground Control Box Terminal Strip Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (AS / CE), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
|
Service and Repair Manual September 2015Jib Boom Components24 Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N Part No. 12684983-4 Jib Boom Lift Cylinder3-4Jib Boom Lift CylinderHow to Remove the Jib Boom LiftCylinderNote: Perform this procedure with the boom in thestowed position.Note: When removing a hose assembly or fitting,the O-ring (if equipped) on the fitting and/or hoseend must be replaced. All connections must betorqued to specification during installation. Refer toSpecifications, Hydraulic Hose and Fitting TorqueSpecifications.1 Raise the jib boom slightly and place blocksunder the platform mounting weldment. Thenlower the jib boom until the platform is restingon the blocks just enough to support theplatform.Note: Do not rest the entire weight of the boom onthe blocks.2 Tag, disconnect and plug the jib boom liftcylinder hydraulic hoses. Cap the fittings onthe cylinder.Bodily injury hazard. Sprayinghydraulic oil can penetrate andburn skin. Loosen hydraulicconnections very slowly to allowthe oil pressure to dissipategradually. Do not allow oil tosquirt or spray.3 Remove the pin retaining fasteners from thejib boom lift cylinder rod-end pivot pin. Do notremove the pin.4 Use a soft metal drift to tap the rod-end pivotpin half way out and lower one of the levelinglinks to the ground. Tap the pin the otherdirection and lower the opposite leveling link.Do not remove the pin.5 Attach a lifting strap from an overhead craneto the rod end of the jib boom lift cylinder.6 Remove the pin retaining fasteners from thejib boom lift cylinder barrel-end pivot pin. Usea soft metal drift to remove the barrel-endpivot pin.7 Use a soft metal drift to remove the jib boomlift cylinder rod-end pivot pin. Remove the jibboom lift cylinder from the machine.Crushing hazard. The jib boomlift cylinder may becomeunbalanced and fall when it isremoved from the machine if it isnot properly supported by theoverhead crane.
PreviousNext |