AX MIG WelderOperating manual - EN5.9 Appendix: System integration checklistThis section lists the tasks necessary to complete the system integration. Each task is a link to the corresponding instruc-tions.Installation:1. Install the power source mains plug2. Install the equipment on the stand (optional)3. Install the cooling unit (optional)4. Install RCM on the power source (optional)5. Mount the wire feeder on the robot arm6. Connect the protective earth cable (optional)7. Install the fieldbus module (optional)8. Install the add-on cards (optional)9. Connect the cables to the wire feeder10. Connect the cables to the power source and RCM11. Turn on the welding system12. Install the wire guide tubes13. Install the feed rolls14. Install the gas supplyConfiguration:1. Connect to the AX Manager user interface2. Configure network settings3. Configure device settings4. Configure robot settings5. Configure fieldbus settings (optional)6. Apply welding programs (configure memory channels)7. Make a system backup file (optional).© Kemppi 176 1921900 / 2318