|
QUICKSTART LSM 510Carl Zeiss Switching on the System LSM 510 META4-10 B 45-0008 e 10/024.2.2 Switching on the Enterprise UVLaser• If the UV laser is required, switch it on via thetoggle switch (4-6/1) of the power supply.− It will be ready for operation after a fewseconds.4.2.3 Starting the LSM 5 ProgramThe LSM 5 software program can be operated intwo different modes (with or without connectedinstrument system). In the on-line mode, the entireprogram package (image recording and analysis) isavailable, while only a part of the softwarefunctions (image analysis only of already storedimages) and no hardware functions are available inthe off-line mode. Of course, the off-line modecan also be started when the instrument system isconnected. In that case, it is not necessary that thelasers and the microscope are switched on.• Double-click on the LSM 510 icon on the desktop of WINDOWS to start the LSM 5 software program(see Fig. 4-5).− The LSM 510 Switchboard menu appears on the screen (see Fig. 4-8).Fig. 4-6 Power supply of UV-Ar laserFig. 4-7 Starting the LSM 5 software PreviousNext |