Tait TB9100 manuals
TB9100
Table of contents
- installation and operation manual
- contact information
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Preface
- Associated Documentation
- Publication Record
- Description
- Features
- Modules
- Base Station Reciter
- Power Amplifier
- Front Panel
- Frequency Bands and Sub-bands
- V DC PA-Only Base Station/Repeater
- Applications
- Simulcast
- Console Gateway
- Signal Paths
- Run and Standby Modes
- Intermodule Communications
- Power Management
- Front Panel Fans
- General Safety and Regulatory Information
- AC Power Connection
- Equipment Safety
- Anti-tampering Devices
- Regulatory Information
- FCC Narrowbanding Regulations
- Installation
- Equipment Ventilation
- Installing and Setting up the CSS
- PC Recommendations
- Setting Up on the Bench
- Confirming Operation
- Connecting the CSS for the First Time and Setting the IP Address
- Finding a Lost or Forgotten IP Address
- Customizing the Configuration
- Changing the Root Password
- Short Tuning Procedure
- Checking the Modulation Fidelity
- Other Operational Tests
- Installing the Base Station on Site
- Tait Limited March
- Connecting Up the Base Station
- Connecting AC Power
- Connecting DC Power
- Connecting the Auxiliary DC Power Output
- Connecting RF
- Connecting an External Frequency Reference
- Connecting a 1PPS Source
- Connecting an Antenna Relay
- Connecting the Analog Line
- Connecting General Purpose Inputs and Outputs
- Operation
- Speaker Operation
- Monitoring with the CSS
- Module LED Indicators and Switches
- Maintenance
- Troubleshooting
- Replacing Modules
- Preliminary Disassembly
- Replacing the Control Panel
- Configuring the Control Panel Board
- Replacing a Reciter
- Replacing a Power Amplifier
- Replacing a Power Management Unit
- Replacing the Front Panel Fans
- Replacing the Module Guide Rails
- Replacing the Subrack Interconnect Board
- Configuring the Subrack Interconnect Board
- Final Reassembly
- Technical Description
- Reciter Module Operation
- PA Module Operation
- PMU Module Operation
- PMU Operation on DC Input
- Control Panel
- System Control Bus
- Appendix A – Interface Pin Assignments
- Microphone Connection
- Appendix B – Inter-Module Connections
- W Base Station
- V PA Base Station
- Dual Channel 5 or 50W Base Station
- Five Reciters and One PMU
- Seven Reciters
- P25 Glossary
TB9100
Table of contents
- Table Of Contents
- Issue
- Basic Tasks
- About the Toolbar
- Equipment Required
- Field Calibration
- P25 Console Gateway Calibration
- Setting Up the Equipment
- Connecting the Calibration Software
- Adjusting the Frequency Setup
- Tuning a UHF Receiver Front End
- Tuning a VHF Receiver Front End
- Adjusting the Exciter Lock Band
- Selecting the Exciter Sub-band
- Calibrating the Reciter
- Calibrating the VCO
- Calibrating the RSSI
- Calibrating the Balanced Line
- Calibrating the Unbalanced Lines
- Calibrating the Power Amplifier
- Calibrating the Forward and Reverse Detector Bias Voltages
- Troubleshooting Tips
- Calibrating the Power Management Unit
- limited warranty
TB9100
Table of contents
- contact information
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Issue
- Publication Record
- Description
- Features
- Modules
- Base Station Reciter
- Power Amplifier
- Front Panel
- Frequency Bands and Sub-bands
- Receive-only Base Station
- Line-Connected Base Station
- Theory of Operation
- Signal Paths
- Run and Standby Modes
- Intermodule Communications
- Power Management
- Front Panel Fans
- General Safety and Regulatory Information
- Explosive Environments
- ESD Precautions
- Environmental Conditions
- Unauthorized Modifications
- Installation
- Equipment Ventilation
- Installing and Setting up the CSS
- Minimum PC Requirements for Running a CSS
- Setting Up on the Bench
- Confirming Operation
- Setting the IP Address
- Finding a Lost or Forgotten IP Address
- Customizing the Configuration
- Tuning
- Other Operational Tests
- Mounting the Subrack
- Connecting Up the Base Station
- Connecting AC Power
- Connecting DC Power
- Connecting the Auxiliary DC Power Output
- Connecting RF
- Connecting an External Frequency Reference
- Tait Electronics Limited January
- Operation
- Speaker Operation
- Microphone Operation
- Monitoring with the CSS
- Module LED Indicators and Switches
- Maintenance
- Troubleshooting
- Replacing Modules
- Preliminary Disassembly
- Replacing the Control Panel
- Configuring the Control Panel Board
- Replacing a Reciter
- Replacing a Power Amplifier
- Replacing a Power Management Unit
- Replacing the Front Panel Fans
- Replacing the Module Guide Rails
- Replacing the Subrack Interconnect Board
- Configuring the Subrack Interconnect Board
- Final Reassembly
- Technical Description
- Reciter Module Operation
- PA Module Operation
- PMU Module Operation
- PMU Operation on DC Input
- Control Panel
- System Control Bus
- Appendix A – Interface Pin Assignments
- Microphone Connection
- Appendix B – Inter-Module Connections
- W Base Station
- V PA Base Station
- Dual Channel 5 or 50W Base Station
- Five Reciters and One PMU
- Seven Reciters
- TaitNet P25 Glossary
- important notice
- limited warranty
TB9100
Table of contents
- contact information
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Preface
- Associated Documentation
- Publication Record
- Description
- Functional Description
- Figure 1.1 High level block diagram
- Mechanical Description
- Mechanical Assembly
- Connections and Controls
- Rear Panel
- Figure 1.5 Connecting one 1PPS TTL output to multiple TB9100 base stations
- Back-up Battery
- Operation
- System Start-up and Shutdown
- Oscillator Control
- Invalid GPS Reference
- GPS Fix Acquisition Times
- Alarms
- PPS Outputs
- Programming
- Installing the Software
- Setting Up the Satsync 7 Module
- Viewing the Data Log
- Viewing the GPS Status
- Upgrading the Satsync 7 Firmware
- System Configuration
- Setting the Links on the System Interface Board
- Figure 4.1 Location of links on the system interface board
- T801-4 with Internal GPS Receiver
- T801-4 with External GPS Receiver
- T801-4 with Internal and External GPS Receivers
- Figure 4.4 Connecting the T801-4 to a GPS antenna and external GPS receiver
- Connection and Configuration
- Alarms and Monitoring
- Installation
- Personal Safety
- Equipment Safety
- Regulatory Information
- Environmental Conditions
- Recommended Tools
- Cabling
- Disposal of Packaging
- Accessories
- Specifications
- Tait General Software Licence Agreement
- limited warranty
- Directive 1999/5/EC Declaration of Conformity
- Chinese RoHS Compliance Information
TB9100
Table of contents
- Table Of Contents
- Table Of Contents
- Preface
- Terminology
- Publication Record
- Replacing the Network Board
- Troubleshooting
- Before You Start
- Removing the Faulty Board
- Restoring the Configuration
- Reciter Circuit Descriptions
- Digital Circuitry
- Digital Signal Processor (DSP)
- Reduced Instruction Set Computer (RISC)
- MHz Digital Clock
- Reference Switch
- Network Circuitry
- Risc Processor
- Memory
- I/O Buffers
- Ethernet Interface
- Audio and E&M Interface
- Clock Oscillator
- RF Circuitry
- Receiver RF Circuitry - UHF Reciter
- Exciter RF Circuitry
- Power Supply
- Appendices
- Appendix B – ASIF Connectors
- Appendix C – Test Points
- Appendix D – Processor Port Assignments
- Appendix E – Component Locations
- Tait Electronics Limited January
TB9100
Table of contents
- contact information
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Tait Electronics Limited May
- Preface
- Issue
- Description
- Modules
- Reciter
- Power Management Unit
- Subrack
- Theory of Operation
- V PA Base Station System
- Power Management
- Power Distribution
- Front Panel Fan Operation
- Run and Standby Modes
- Signal Voting and Switching
- Base Station Options
- Encryption
- General Safety and Regulatory Information
- Equipment Safety
- Environmental Conditions
- Regulatory Information
- Unauthorized Modifications
- Maintenance
- Installation
- Equipment Ventilation
- Installing and Setting up the CSS
- Minimum PC Hardware Requirements for Running CSS
- Setting Up on the Bench
- Tuning
- Connecting to a Calibration and Test Unit
- Setting the Base Station IP Address
- Finding a Lost or Forgotten IP Address
- Customizing the Configuration
- Mounting the Subrack
- Connecting Up the Base Station
- Control Panel Connections
- Auxiliary DC Power
- RF Connections
- Coaxial Relay
- Base Station Operation
- Monitoring the Base Station
- Microphone Operation
- Troubleshooting
- 4 TB9100 Installation and Operation Manual
- Replacing Modules
- Replacing the Control Panel
- Replacing the Reciter
- Replacing the Power Amplifier
- Replacing the Power Management Unit
- Replacing the Front Panel Fans
- Replacing the Module Guide Rails
- Replacing the Subrack Interconnect Board
- Final Reassembly
- Technical Description
- Reciter Module Operation
- Signal Paths
- Output Paths
- Voting
- Switching and Voting Priorities
- Signaling messages
- Re-voting
- PA Module Operation
- PMU Module Operation
- PMU Operation on DC Input
- Control Panel
- System Control Bus
- Appendix A – Interface Pin Assignments
- Digital Interface Connection
- Microphone Connection
- Appendix B – Inter-Module Connections
- W Base Station
- V PA Base Station
manualsdatabase
Your AI-powered manual search engine