Small Office Remote Access Switch 105A PPLE T ALK R OUTING N ETWORKVerify the Installation• next hop’s device nameWhenever you enter 0.0 for the next hop address, you are then required to enter the next hop’sdevice name. Enter SITE2.• number of hopsThis is the number of devices between the device you are configuring and the network acrossthe WAN. In this case, there is one site, SITE2, between SITE1 and the network across the WAN.Enter 1 for the number of hops.• default zone nameTo enter the zone names associated with SITE2’s LAN segment, first enter SITE2.Engineering asthe default zone name, then add SITE2.Marketing as a second zone name.Return to the main CFGEDIT menu.SAVE CONFIGURATION F ILESWe have now configured all required information for this example. Select Save Changes from themain CFGEDIT menu. Follow the on-screen instructions to save any configuration changes made.The old configuration files will be stored in the \CONFIG directory with a file extension of .BAK(e.g., the old NODE.NEI file will be called NODE.BAK).After saving the configuration files, press to exit the CFGEDIT program. Reboot the systemto activate your changes.V ERIFY THE INSTALLATIONSteps on how to verify the installation are detailed in the System Verification chapter of the User’sGuide. This section gives an outline of which steps should be executed.On the CyberSWITCH:Verify hardware resources are operationalIssuedr commandLook for BRI messagesLook for LAN initialized messagesVerify WAN Lines AvailableConnect WAN linesIssuedr commandLook for “Data Link up 1,1” in reportsOn each AppleTalk LAN:Attempt accessing a resource on the CyberSWITCH LAN. This may require that you rebootyour system and proceed through the logon sequence.