3 - 167Chapter 3 Removal and Replacement Procedures (RRPs)RRP5.5 ROLL-REGI (PL 5.2.4)[Removal]1) Remove VERTICAL TRANSPORT ASSEMBLY. (RRP 5.3)2) Remove REAR CHUTE ASSEMBLY. (RRP 5.1)3) Remove MOTOR-PH. (RRP 5.11)4) Remove GEAR ASSY DRIVE. (RRP 5.14)5) Remove CLUTCH ASSY PH: REGI. (RRP 5.4)6) Remove two E rings that fix GEAR-REGI (PL 5.2.6) from VERTICAL TRANSPORTASSEMBLY (PL 5.2.1) and remove two GEAR-REGIs.7) Remove BEARING METALs (PL 5.2.3) on right and left sides that fix ROLL-REGI (PL 5.2.4)from VERTICAL TRANSPORT ASSEMBLY.8) Move ROLL-REGI to left side once, pull out the shaft of ROLL-REGI from right side bearing ofVERTICAL TRANSPORT ASSEMBLY and remove ROLL-REGI.[Replacement]1) After placing the left side of shaft of ROLL-REGI in the left side bearing of VERTICALTRANSPORT ASSEMBLY, move ROLL-REGI to right side and attach it.2) Match the double D-cut section of BEARING METAL to right and left sides shaft of FRAME-ASSY PH, attach BEARING METAL and fix ROLL-REGI.3) Attach GEAR-REGI to the right side shaft of ROLL-REGI and right side shaft of ROLL ASSY-REGI (PL 5.2.8), and fix them using two E rings.4) Attach CLUTCH ASSY PH: REGI. (RRP 5.4)5) Attach GEAR ASSY DRIVE. (RRP 5.14)6) Attach MOTOR-PH. (RRP 5.11)7) Attach REAR CHUTE ASSEMBLY. (RRP 5.1)8) Attach FRAME-ASSY-PH. (RRP 5.3)