Eaton 93PM UPS (400V/480V Four-Wire – 100 kW Frame) Installation and Operation Manual 164000566—Rev 04 13Table 2. Air Conditioning or Ventilation Requirements During Full Load Operation (480V) (Continued)ModelUPSRatingVoltageRatingHeat RejectionBTU/hr x1000(kg-cal/hr)Minimum RequiredCooling Air Flowat Full LoadEaton 93PM-100-2Eaton 93PM-100-3 (N+1) 60 kW 7.16 (1807)Eaton 93PM-100-2Eaton 93PM-100-3 (N+1) 70 kW 8.36 (2108)Eaton 93PM-100-2Eaton 93PM-100-3 (N+1) 80 kW 9.12 (2300)Eaton 93PM-100-2Eaton 93PM-100-3 (N+1) 90 kW 10.26 (2588)Eaton 93PM-100-2Eaton 93PM-100-3 (N+1) 100 kW 11.40 (2875)The UPS equipment operating environment must meet the weight requirements shown in Table 3 and the sizerequirements shown in Figure 3 through Figure 10. Dimensions are in millimeters (inches).NOTE Refer to the Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass Installation andOperation (50 kW and 100 kW SIAC-B) Manual, listed in paragraph1.8 For More Information, for Sidecar Integrated Accessory Cabinet-Bypass (SIAC-B)size requirements.Table 3. UPS Cabinet WeightsModelWeight kg (lb)Shipping InstalledPointLoadingEaton 93PM-100-1 381 (840) 361 (797) 4 at 90 (199)Eaton 93PM-100-2 445 (980) 425 (937) 4 at 106 (234)Eaton 93PM-100-3 509 (1121) 489 (1078) 4 at 122 (270)Eaton 93PM-100-1 UPS with UPS Top Entry Wiring Sidecar (nobreakers) 459 (1012) 436 (962) 4 at 109 (241)Eaton 93PM-100-2 UPS with UPS Top Entry Wiring Sidecar (nobreakers) 523 (1152) 500 (1102) 4 at 125 (276)Eaton 93PM-100-3 UPS with UPS Top Entry Wiring Sidecar (nobreakers) 587 (1293) 564 (1243) 4 at 141 (311)Eaton 93PM-100-1 UPS with Left or Right-Mounted 4-Breaker SIAC-B 486 (1073) 463 (1022) 4 at 116 (256)Eaton 93PM-100-2 UPS with Left or Right-Mounted 4-Breaker SIAC-B 550 (1213) 527 (1162) 4 at 291 (291)Eaton 93PM-100-3 UPS with Left or Right-Mounted 4-Breaker SIAC-B 614 (1354) 591(1303) 4 at 148 (326)UPS Installation Plan and Unpacking