Eaton 93PM UPS (400V/480V Four-Wire – 100 kW Frame) Installation and Operation Manual 164000566—Rev 04 viiLLiisstt ooff FFiigguurreessFigure 1. Eaton 93PM UPS ........................................................................................................................... 2Figure 2. Eaton 93PM UPS with Left or Right-Mounted Top Entry Wiring Sidecar ..................................................... 2Figure 3. UPS Cabinet Dimensions (Front and Right Side Views)......................................................................... 15Figure 4. UPS Cabinet Dimensions (Top and Bottom Views) .............................................................................. 16Figure 5. UPS Cabinet Front and Back Floor Mounting Bracket Mounting Dimensions (Back Views) ........................... 17Figure 6. UPS Cabinet with Left or Right-Mounted Sidecar Dimensions (Front Views) ............................................. 18Figure 7. UPS Cabinet with Left or Right-Mounted Sidecar Dimensions (Top and Bottom Views) ............................... 19Figure 8. UPS Cabinet Center of Gravity ........................................................................................................ 20Figure 9. UPS Cabinet with Left or Right-Mounted Sidecar Center of Gravity ......................................................... 21Figure 10. Remote EPO Switch Dimensions .................................................................................................... 22Figure 11. 93PM External Parallel Wire Length ................................................................................................. 24Figure 12. UPS Cabinet as Shipped on Pallet .................................................................................................... 51Figure 13. UPS Cabinet with Left-Mounted or Right-Mounted Top Entry Wiring Sidecar as Shipped on Pallet................. 52Figure 14. Removing the Pallet Skids and Supports – Eaton 93PM UPS ................................................................. 54Figure 15. Removing the Sidecar Pallet Skids and Supports – Eaton 93PM UPS....................................................... 55Figure 16. Removing the Sidecar Rear Shipping Bracket – Eaton 93PM UPS .......................................................... 57Figure 17. UPS Conduit and Wire Entry Locations ............................................................................................. 59Figure 18. Sidecar Conduit and Wire Entry Locations ......................................................................................... 60Figure 19. UPS Inter-Cabinet Wiring Access Location......................................................................................... 61Figure 20. Power Terminal Locations.............................................................................................................. 62Figure 21. Power Terminal Detail ................................................................................................................... 63Figure 22. Interface Terminal Locations........................................................................................................... 65Figure 23. Interface Terminal Detail................................................................................................................ 65Figure 24. Bottom Access Interface Wiring Location.......................................................................................... 66Figure 25. Wire Tie Anchors ......................................................................................................................... 67Figure 26. Building Alarm Terminal Block Connector Assignments ........................................................................ 68Figure 27. Relay Contact Terminal Block Connector Assignments......................................................................... 68Figure 28. Battery Shunt Trip Locations........................................................................................................... 72Figure 29. Battery Shunt Trip Terminal Detail.................................................................................................... 73Figure 30. Battery Shunt Trip Terminal Assignments.......................................................................................... 73Figure 31. External Parallel CAN Wiring ........................................................................................................... 77Figure 32. External Parallel Terminal Block ....................................................................................................... 77Figure 33. External Parallel Pull Chain Wiring .................................................................................................... 79Figure 34. REPO Switch .............................................................................................................................. 82Figure 35. REPO Terminal Block Connector Assignments ................................................................................... 83Figure 36. Normally-Open REPO Switch Wiring ................................................................................................ 83Figure 37. Normally-Closed REPO Switch Wiring .............................................................................................. 84Figure 38. Main Elements of the UPS System .................................................................................................. 87Figure 39. Path of Current Through the UPS in Energy Saver System Mode............................................................ 89