UPS INSTALLATION PLAN AND UNPACKINGEaton Power Xpert 9395P-1200 UPS (1200 kVA, 1200 kW) Installation and Operation Manual P-164000500 Rev 4 www.eaton.com/powerquality3-4The UPS ventilation requirements are shown in Table 3‐3 through Table 3-6.Table 3‐3. 480V Air Conditioning or Ventilation Requirements During Full Load OperationModel Rating Input/OutputVoltageHeat RejectionkW (1000 BTU/hr) Ventilation Required for Cooling Air ExhaustEaton 9395P-1200/1200(CSS or IOM)1200 kVA1200 kW 480/480 46.1 (157) Approximately 4250 liter/sec (9000 CFM)Eaton 9395P-1200/1200(CSS or IOM)1200 kVA1100 kW 480/480 42.3 (144)Approximately 4250 liter/sec (9000 CFM)Eaton 9395P-1200/1100(CSS or IOM)1100 kVA1100 kW 480/480 42.3 (144)Eaton 9395P-1200/1000(CSS or IOM)1000 kVA1000 kW 480/480 37.3 (128)Eaton 9395P-1200/900(CSS or IOM)900 kVA900 kW 480/480 34.6 (118)Approximately 3300 liter/sec (7000 CFM)Eaton 9395P-1200/900(CSS or IOM)900 kVA825 kW 480/480 31.7 (108)Eaton 9395P-1200/825(CSS or IOM)825 kVA825 kW 480/480 31.7 (108)Eaton 9395P-1200/750(CSS or IOM)750 kVA750 kW 480/480 28.0 (95.6)Eaton 9395P-1200/675(CSS or IOM)675 kVA675 kW 480/480 23.8 (81.1)NOTE CSS = Continuous Static Switch; IOM = Input Output ModuleTable 3‐4. 415V/400V/380V Air Conditioning or Ventilation Requirements During Full Load OperationModel Rating Input/OutputVoltageHeat RejectionkW (1000 BTU/hr) Ventilation Required for Cooling Air ExhaustEaton 9395P-1200/1100(CSS)1100 kVA1100 kW415/415400/400380/38050.2 (172)Approximately 3300 liter/sec (7000 CFM)With field installed UPM:Approximately 4250 liter/sec (9000 CFM)Eaton 9395P-1200/1000(CSS)1000 kVA1000 kW415/415400/400380/38044.1 (151)Eaton 9395P-1200/900(CSS)900 kVA900 kW415/415400/400380/38038.2 (131)Approximately 2400 liter/sec (5000 CFM)Eaton 9395P-1200/825(CSS)825 kVA825 kW415/415400/400380/38037.7 (129)Eaton 9395P-1200/750(CSS)750 kVA750 kW415/415400/400380/38033.1 (113)Eaton 9395P-1200/675(CSS)675 kVA675 kW415/415400/400380/38028.7 (98)NOTE CSS = Continuous Static Switch