UPS SYSTEM INSTALLATIONEaton Power Xpert 9395P-1200 UPS (1200 kVA, 1200 kW) Installation and Operation Manual P-164000500 Rev 4 www.eaton.com/powerquality 4-374.11 Installing Options, Accessories, and Distributed Bypass Control WiringTo install options, accessories, and distributed bypass control wiring, see Chapter 5,“Installing Options and Accessories.”4.12 Initial StartupStartup and operational checks must be performed by an authorized Eaton CustomerService Engineer, or the warranty terms specified on page W-1 become void. Thisservice is offered as part of the sales contract for the UPS. Contact an Eaton servicerepresentative in advance (usually a two-week notice is required) to reserve apreferred startup date.4.13 Completing the Installation ChecklistThe final step in installing the UPS system is completing the following InstallationChecklist. This checklist ensures that you have completely installed all hardware,cables, and other equipment. Complete all items listed on the checklist to ensure asmooth installation. Make a copy of the Installation Checklist before filling it out, andretain the original.After the installation is complete, an Eaton Customer Service Engineer must verifythe operation of the UPS system and commission it to support the critical load. Theservice representative cannot perform any installation tasks other than verifyingsoftware and operating setup parameters. Service personnel may request a copy ofthe completed Installation Checklist to verify all applicable equipment installationshave been completed.NOTE The Installation Checklist MUST be completed prior to starting the UPS system for the first time.Distributed Bypass Installation Checklist Each cabinet in the distributed bypass system is placed in its installed location. All conduits and cables are properly routed to the UPS cabinets and to the tie cabinet or distribution panel. All power cables are properly sized and terminated. A ground conductor is properly installed. Controller Area Network (CAN) wiring between the UPS cabinets is properly installed. Pull-chain wiring between the UPS cabinets is properly installed. Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets. Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.