UPS INSTALLATION PLAN AND UNPACKINGEaton Power Xpert 9395P-1200 UPS (1200 kVA, 1200 kW) Installation and Operation Manual P-164000500 Rev 4 www.eaton.com/powerquality3-342. Use a forklift or pallet jack to move the packaged cabinets to the installation site,or as close as possible, before unpacking. If possible, move the cabinets usingthe pallet. Insert the forklift or pallet jack forks from the right side of the pallet(facing the cabinet), between the supports on the bottom of the pallet (seeFigure 3‐9 to Figure 3‐11 for the UPS cabinet center of gravity measurements). Ifthe cabinets must be moved using the cabinet front or rear fork lift slots, see thecaution statement at the beginning of this procedure.C A U T I O NDo not tilt the UPS cabinets more than 10° from vertical or the cabinets may tip over.MISE EN GARDE!Ne pas incliner les armoires d’onduleur à plus de 10 degrés de la verticale puisqu’elles pourraient serenverser.3. Set the pallet on a firm, level surface, allowing a minimum clearance of 3m (10 ft)on each side for removing the cabinet from the pallet.NOTE The ISBM and UPM sections are shipped with debris shields covering the ventilation grills on top ofthe sections (see Figure 4‐15). Do not remove the debris shields until installation is complete.4. Remove the protective covering from the cabinets.5. Remove the packing material, and discard or recycle in a responsible manner.6. Inspect the contents for any evidence of physical damage, and compare eachitem with the Bill of Lading. If damage has occurred or shortages are evident,contact an Eaton service representative immediately to determine the extent ofthe damage and its impact on further installation.NOTE While waiting for installation, protect the unpacked cabinets from moisture, dust, and other harmfulcontaminants. Failure to store and protect the UPS properly may void your warranty.