UPS INSTALLATION PLAN AND UNPACKINGEaton Power Xpert 9395P-1200 UPS (1200 kVA, 1200 kW) Installation and Operation Manual P-164000500 Rev 4 www.eaton.com/powerquality3-24Terminals E1 through E11 are 2‐hole busbar mountings for standard NEMA 2‐holebarrel lugs. The power wiring connections for this equipment are rated at 90°C. SeeTable 3‐17 for power cable terminations, Table 3‐18 for supplied terminal hardware,and Table 3‐19 for recommended installation parts and tools not supplied by Eaton.Figure 4‐17 through Figure 4‐20 show the location of the power cable terminals insidethe UPS.Table 3‐17. UPS External Power Cable Terminations for Three/Four UPM ModelsTerminal Function Terminal Function Bus Landings(using both sides of bus)Tightening TorqueNm (lb ft) Bolt SizeAC Input to UPS RectifierE1 Phase A 6 – 2 bolt mounting 76 (56) M12E2 Phase B 6 – 2 bolt mounting 76 (56) M12E3 Phase C 6 – 2 bolt mounting 76 (56) M12AC Input to BypassE6 Phase A 6 – 2 bolt mounting 76 (56) M12E7 Phase B 6 – 2 bolt mounting 76 (56) M12E8 Phase C 6 – 2 bolt mounting 76 (56) M12AC Output to Critical LoadE9 Phase A 6 – 2 bolt mounting 76 (56) M12E10 Phase B 6 – 2 bolt mounting 76 (56) M12E11 Phase C 6 – 2 bolt mounting 76 (56) M12DC Input from Battery or BatteryDisconnect to UPS – CommonBatteryE4 Battery (+) 16 – 2 bolt mounting 76 (56) M12E5 Battery (-) 16 – 2 bolt mounting 76 (56) M12DC Input from Battery or BatteryDisconnect to UPS – SeparateBattery (UPM 1)E4 Battery (+) 4 – 2 bolt mounting 76 (56) M12E5 Battery (-) 4 – 2 bolt mounting 76 (56) M12DC Input from Battery or BatteryDisconnect to UPS – SeparateBattery (UPM 2)E4 Battery (+) 4 – 2 bolt mounting 76 (56) M12E5 Battery (-) 4 – 2 bolt mounting 76 (56) M12DC Input from Battery or BatteryDisconnect to UPS – SeparateBattery (UPM 3)E4 Battery (+) 4 – 2 bolt mounting 76 (56) M12E5 Battery (-) 4 – 2 bolt mounting 76 (56) M12DC Input from Battery or BatteryDisconnect to UPS – SeparateBattery (UPM 4 FI-UPM)E4 Battery (+) 4 – 2 bolt mounting 76 (56) M12E5 Battery (-) 4 – 2 bolt mounting 76 (56) M12Input and Output Neutral E12 Neutral 12 – 2 bolt mounting 76 (56) M12Customer Ground Ground Ground 15 – 2 bolt mounting 76 (56) M12NOTE Customer ground, sized in accordance with NEC Table 250.122, can be run in any conduit listed in Table 3‐20.NOTE Bypass terminations are not applicable to IOM configurations.