UPS INSTALLATION PLAN AND UNPACKINGEaton Power Xpert 9395P-1200 UPS (1200 kVA, 1200 kW) Installation and Operation Manual P-164000500 Rev 4 www.eaton.com/powerquality 3-19Table 3‐11. 400V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Common BatteryBasic Unit RatingUnitsRating50/60HzRating50/60HzRating50/60HzRating50/60HzRating50/60HzRating50/60HzkVAkW6756757507508258259009001000100011001100Input and Output Voltage Volts 400/400 400/400 400/400 400/400 400/400 400/400AC Input to UPS Rectifier (0.98 Minimum pF)Full load current plus battery recharge current(3) Phases, (1) GroundMinimum Conductor SizeNumber per PhaseAAmps 1199 1332 1465 1599 1776 1954AWG orkcmil(each)500(5)500(6)500(6)500(6)500(8)500(8)AC Input to UPS Bypass (Five Wire)Full Load Current(3) Phases, (1) Neutral, (1) GroundBAmps 974 1083 1191 1299 1443 1588Minimum Conductor SizeNumber per PhaseAWG orkcmil(each)500(5)500(5)500(5)500(6)500(6)500(6)DC Input from Battery Disconnect to UPS(1) Positive, (1) NegativeMinimum Conductor SizeNumber per Pole(1) Positive, (1) NegativeCTotalAmps 1480 1645 1809 1974 2193 2412AWG orkcmil(each)500(6)500(8)500(8)500(8)500(9)500(12)AC Output to Critical Load (Five Wire)Full Load Current(3) Phases, (1) Neutral, (1) GroundDAmps 974 1083 1191 1299 1443 1588Minimum Conductor SizeNumber per PhaseAWG orkcmil(each)500(5)500(5)500(5)500(6)500(6)500(6)NOTE Callout letters A, B, C, and D map to Figure 6‐5 .NOTE Bypass wiring data is not applicable to IOM configurations.Battery Conductor Sizing: Eaton strongly recommends using the specified DC conductor size and quantity shown above for optimum systemperformance and battery run time.Battery Cable Routing RequirementsConduit applications:* Each conduit must have a Positive, Negative, and Ground conductor.* There must be an equal number of positive and negative conductors in a single conduit. Only one ground conductor is required in eachconduit.Raceway applications:* Positive and negative battery cables must be run side by side in the raceway in an alternating pattern (+ - + - + - + -).* There must be a ground cable running in the raceway with the battery cables.