September 2016 Service ManualChecklist B ProceduresPart No. 38139 AWP Super Series • IWP Super Series 533 Compress the spring to 15/16 in / 2.4 cm byturning the nylock nut clockwise to increasethe spring compression or counterclockwise todecrease the spring compression.Component damage hazard. Donot exceed the recommendedspring compression.4 Confirm the spring measurement on eachsequencing cable.5 Raise and lower the platform through threecomplete cycles and confirm the springcompression.6 Repeat adjustment for each cable as required.B-9 Ins pect for Proper Outri gger Length - AW PS Model sB-9Inspect for Proper OutriggerLength - AWPS ModelsGenie specifications require that this procedure beperformed every 250 hours or quarterly, whichevercomes first.Proper outrigger length is essential to safe machineoperation. Operating a machine with outriggersdifferent from those originally designed for themodel will result in death or serious injury.1 Measure each outrigger and verify for properlength.