Contents - Table Of Contents
- Table Of Contents
- Table Of Contents
- General
- Safety
- Limits of operation and use
- Risk from electrocution
- Personnel requirements - Qualifications
- Transport, storage and packaging
- Storage
- Technical data
- Construction and function
- Wear parts list
- Installation and wiring
- Requirements governing the installation site
- Minimum clearances
- Installation
- Installation of basic unit
- Installation of casing
- Installing the sheet steel accessories
- Connection to the pipe network
- Sealing the pipework to the valve condensation tray
- Overview of valve kits
- Connection of 2-way valve kit
- Connection of 3-way valve kit
- Connection of differential pressure-dependent valve kit
- Condensation connection
- Electrical wiring
- Electromechanical control, Venkon AC
- Cabling, Venkon AC (*A00M), control by room thermostat type 148916
- Cabling, Venkon AC (*A00M), control by room thermostat type 148916, with condensation monitor
- Cabling, Venkon AC (*A00M), control by room thermostat type 148915/148918/148917
- Cabling, Venkon AC (*A00M), control by room thermostat type 148915/148918/148917, with con
- Electromechanical control, Venkon EC
- Cabling, Venkon EC (*00M or 01M), control by Climate Controller 30155
- Cabling, Venkon EC (*00M or 01M), control by Climate Controller 30155, with condensation monitor
- Cabling, Venkon EC (*00M or 01M), control by Climate Controller 30256
- Cabling, Venkon EC (*00M or 01M), control by Climate Controller 30256, with condensation monitor
- Cabling, Venkon EC (*00M or 01M), control by Climate Controller Type 148941/148942
- Cabling, Venkon EC (*00M or 01M), control by Climate Controller Type 148941/148942, with condens
- KaControl (*C1)
- Connection (*C1)
- Cabling, Venkon EC, KaControl (*C1*), control by KaController
- Cabling, Venkon EC, KaControl (*C1*), control by in situ 0-10 V DC signal
- Pre-commissioning checks
- Operation
- Operation of the KaController
- Maintenance
- Maintenance work
- Cleaning the main condensation tray
- Cleaning the valve condensation tray
- Clean the inside of the unit
- Faults
- KaControl faults
- List of KaControl parameters
- KaController parameter list
- Certificates
- Table
|
VenkonAssembly, installation and operating instructions608 Pre-commissioning checksCheck before initial commissioning whether all necessary conditions have been met so that the unit can function safely andproperly.Structural testsRemove air outlet protection from the outlet air area.Remove protective film from the intake area.Check that the unit is securely standing and fixed.Check that the unit is horizontal.Check the completeness and correct seating of all filters (dirt side).Check whether all components are properly fitted.Check whether all air ducts are mechanically fixed in place.Check whether all dirt, such as packaging or site dirt, has been removed.Electrical testsCheck all external electrical connections and terminal connections are fixed in place and tighten if necessary.Check whether all lines have been properly laid.Are all wires connected in accordance with the electric wiring diagrams?Is the earth wire connected and wired throughout?Check whether all lines have the necessary cross-section.Check whether jumpers and DIP switches have been correctly set as per the wiring diagram.Water-side checksCheck the leak-tightness of all lines (pressure test and visual check).Check whether all bleed screws are closed.Check whether the parts carrying water have been flushed through.Check whether all supply and drainage lines have been properly connected.Check whether any electrically actuated shut-off valves have been properly connected.Check whether all valves and actuators are working properly (note permitted mounting position).Check whether any shut-off valves fitted on site are open.Air-side checksCheck whether there is unimpeded flow at the air inlet and outlet.Check whether the air inlet filter is fitted and dirt-free.Condensation water connectionCheck whether the condensation tray is free of building rubble.