128 Chapter 11 Configuring MPB96 boardsInstalling valid configurationsATTENTIONYou must use one of the valid configurations and respect the slot map or thesystem behavior will be erratic.T1 switch connectivityTo configure one MPB96 and two T1 PCI cardsStep Action1 Plug the MPB96 card in PCI slot 3.2 On the first Intel D/480JCT-2T1 PCI card:a. Set the card SW100 ID rotary dial switch to 0.b. Ensure that there are no termination jumpers installed on P700.3 Plug the first Intel D/480JCT-2T1 PCI card 1 in PCI slot 4.4 On the second Intel D/480JCT-2T1 PCI card:a. Set the card SW100 ID rotary dial switch to 1.b. Install a termination jumper on P700 3&4 termination jumpersON (to enable CT Bus termination).Note: Only one Intel D/480JCT-2T1 PCI card in the system (thelast on the CT Bus cable) should have the termination jumperset to ON.5 Plug the Intel D/480JCT-2T1 PCI card 1 in PCI slot 5.6 Connect the 3 drop CT-Bus cable so all three connectors aresecurely connected to all cards.Note: If a 7 drop cable is used in this configuration, ensurethat the end connectors are connected to the end cards and noconnector is left dangling at any end of the cable.—End—To configure three MPB96 and four T1 PCI cardsStep Action1 Plug the MPB96 card in PCI slot 3.2 On the first Intel D/480JCT-2T1 PCI card:Nortel CallPilot1002rp Server Maintenance and DiagnosticsNN44200-701 01.02 Standard5.0 4 April 2007Copyright © 2007, Nortel Networks Nortel Networks Confidential.