Manuals database logo
manualsdatabase
Your AI-powered manual search engine

Tait TB9100 manuals

TB9100 first page preview

TB9100

Brand: Tait | Category: Gateway
Table of contents
  1. installation and operation manual
  2. contact information
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Preface
  8. Associated Documentation
  9. Publication Record
  10. Description
  11. Features
  12. Modules
  13. Base Station Reciter
  14. Power Amplifier
  15. Front Panel
  16. Frequency Bands and Sub-bands
  17. V DC PA-Only Base Station/Repeater
  18. Applications
  19. Simulcast
  20. Console Gateway
  21. Signal Paths
  22. Run and Standby Modes
  23. Intermodule Communications
  24. Power Management
  25. Front Panel Fans
  26. General Safety and Regulatory Information
  27. AC Power Connection
  28. Equipment Safety
  29. Anti-tampering Devices
  30. Regulatory Information
  31. FCC Narrowbanding Regulations
  32. Installation
  33. Equipment Ventilation
  34. Installing and Setting up the CSS
  35. PC Recommendations
  36. Setting Up on the Bench
  37. Confirming Operation
  38. Connecting the CSS for the First Time and Setting the IP Address
  39. Finding a Lost or Forgotten IP Address
  40. Customizing the Configuration
  41. Changing the Root Password
  42. Short Tuning Procedure
  43. Checking the Modulation Fidelity
  44. Other Operational Tests
  45. Installing the Base Station on Site
  46. Tait Limited March
  47. Connecting Up the Base Station
  48. Connecting AC Power
  49. Connecting DC Power
  50. Connecting the Auxiliary DC Power Output
  51. Connecting RF
  52. Connecting an External Frequency Reference
  53. Connecting a 1PPS Source
  54. Connecting an Antenna Relay
  55. Connecting the Analog Line
  56. Connecting General Purpose Inputs and Outputs
  57. Operation
  58. Speaker Operation
  59. Monitoring with the CSS
  60. Module LED Indicators and Switches
  61. Maintenance
  62. Troubleshooting
  63. Replacing Modules
  64. Preliminary Disassembly
  65. Replacing the Control Panel
  66. Configuring the Control Panel Board
  67. Replacing a Reciter
  68. Replacing a Power Amplifier
  69. Replacing a Power Management Unit
  70. Replacing the Front Panel Fans
  71. Replacing the Module Guide Rails
  72. Replacing the Subrack Interconnect Board
  73. Configuring the Subrack Interconnect Board
  74. Final Reassembly
  75. Technical Description
  76. Reciter Module Operation
  77. PA Module Operation
  78. PMU Module Operation
  79. PMU Operation on DC Input
  80. Control Panel
  81. System Control Bus
  82. Appendix A – Interface Pin Assignments
  83. Microphone Connection
  84. Appendix B – Inter-Module Connections
  85. W Base Station
  86. V PA Base Station
  87. Dual Channel 5 or 50W Base Station
  88. Five Reciters and One PMU
  89. Seven Reciters
  90. P25 Glossary
TB9100 first page preview

TB9100

Brand: Tait | Category: Accessories
Table of contents
  1. contact information
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Issue
  7. Publication Record
  8. Description
  9. Features
  10. Modules
  11. Base Station Reciter
  12. Power Amplifier
  13. Front Panel
  14. Frequency Bands and Sub-bands
  15. Receive-only Base Station
  16. Line-Connected Base Station
  17. Theory of Operation
  18. Signal Paths
  19. Run and Standby Modes
  20. Intermodule Communications
  21. Power Management
  22. Front Panel Fans
  23. General Safety and Regulatory Information
  24. Explosive Environments
  25. ESD Precautions
  26. Environmental Conditions
  27. Unauthorized Modifications
  28. Installation
  29. Equipment Ventilation
  30. Installing and Setting up the CSS
  31. Minimum PC Requirements for Running a CSS
  32. Setting Up on the Bench
  33. Confirming Operation
  34. Setting the IP Address
  35. Finding a Lost or Forgotten IP Address
  36. Customizing the Configuration
  37. Tuning
  38. Other Operational Tests
  39. Mounting the Subrack
  40. Connecting Up the Base Station
  41. Connecting AC Power
  42. Connecting DC Power
  43. Connecting the Auxiliary DC Power Output
  44. Connecting RF
  45. Connecting an External Frequency Reference
  46. Tait Electronics Limited January
  47. Operation
  48. Speaker Operation
  49. Microphone Operation
  50. Monitoring with the CSS
  51. Module LED Indicators and Switches
  52. Maintenance
  53. Troubleshooting
  54. Replacing Modules
  55. Preliminary Disassembly
  56. Replacing the Control Panel
  57. Configuring the Control Panel Board
  58. Replacing a Reciter
  59. Replacing a Power Amplifier
  60. Replacing a Power Management Unit
  61. Replacing the Front Panel Fans
  62. Replacing the Module Guide Rails
  63. Replacing the Subrack Interconnect Board
  64. Configuring the Subrack Interconnect Board
  65. Final Reassembly
  66. Technical Description
  67. Reciter Module Operation
  68. PA Module Operation
  69. PMU Module Operation
  70. PMU Operation on DC Input
  71. Control Panel
  72. System Control Bus
  73. Appendix A – Interface Pin Assignments
  74. Microphone Connection
  75. Appendix B – Inter-Module Connections
  76. W Base Station
  77. V PA Base Station
  78. Dual Channel 5 or 50W Base Station
  79. Five Reciters and One PMU
  80. Seven Reciters
  81. TaitNet P25 Glossary
  82. important notice
  83. limited warranty
TB9100 first page preview

TB9100

Brand: Tait | Category: Accessories
Table of contents
  1. contact information
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Tait Electronics Limited May
  6. Preface
  7. Issue
  8. Description
  9. Modules
  10. Reciter
  11. Power Management Unit
  12. Subrack
  13. Theory of Operation
  14. V PA Base Station System
  15. Power Management
  16. Power Distribution
  17. Front Panel Fan Operation
  18. Run and Standby Modes
  19. Signal Voting and Switching
  20. Base Station Options
  21. Encryption
  22. General Safety and Regulatory Information
  23. Equipment Safety
  24. Environmental Conditions
  25. Regulatory Information
  26. Unauthorized Modifications
  27. Maintenance
  28. Installation
  29. Equipment Ventilation
  30. Installing and Setting up the CSS
  31. Minimum PC Hardware Requirements for Running CSS
  32. Setting Up on the Bench
  33. Tuning
  34. Connecting to a Calibration and Test Unit
  35. Setting the Base Station IP Address
  36. Finding a Lost or Forgotten IP Address
  37. Customizing the Configuration
  38. Mounting the Subrack
  39. Connecting Up the Base Station
  40. Control Panel Connections
  41. Auxiliary DC Power
  42. RF Connections
  43. Coaxial Relay
  44. Base Station Operation
  45. Monitoring the Base Station
  46. Microphone Operation
  47. Troubleshooting
  48. 4 TB9100 Installation and Operation Manual
  49. Replacing Modules
  50. Replacing the Control Panel
  51. Replacing the Reciter
  52. Replacing the Power Amplifier
  53. Replacing the Power Management Unit
  54. Replacing the Front Panel Fans
  55. Replacing the Module Guide Rails
  56. Replacing the Subrack Interconnect Board
  57. Final Reassembly
  58. Technical Description
  59. Reciter Module Operation
  60. Signal Paths
  61. Output Paths
  62. Voting
  63. Switching and Voting Priorities
  64. Signaling messages
  65. Re-voting
  66. PA Module Operation
  67. PMU Module Operation
  68. PMU Operation on DC Input
  69. Control Panel
  70. System Control Bus
  71. Appendix A – Interface Pin Assignments
  72. Digital Interface Connection
  73. Microphone Connection
  74. Appendix B – Inter-Module Connections
  75. W Base Station
  76. V PA Base Station
Related products
TB7100TB9000TB8100TB9400TB9300TB7000TB8000TB7200TB7300T800 - 25 - 0000
Tait categories
More Tait categories
Manuals database logo
manualsdatabase
Your AI-powered manual search engine