V7122 Gateway User Guide 41CHAPTER 3: I NSTALLATIONThis section provides detailed information on the installation procedures for the followingproducts: V7122 (See Installing the V7122) TP-1610 (See Installing the TP-1610). TP-260 (see Installing the TP-260).For information on how to start using the gateway, see 1 Chapter 4: Getting Started.WARNING: Electrical Shock!The equipment must only be installed or serviced by qualified service personnel.Installing the V7122To install the gateway:1 Unpack the V7122 (see 1 Unpacking).2 Check the package contents (see Package Contents).3 Mount the V7122 (see Mounting the V7122).4 Cable the V7122 (see Cabling the V7122).After powering-up the V7122, the Ready and LAN LEDs on the front panel turn to green(after a self-testing period of about 3 minutes). Any malfunction changes the Ready LED tored (see TP-1610 Front Panel LED Indicators for details on the V7122 LEDs).When you have completed the above relevant sections you are then ready to startconfiguring the gateway (1Chapter 4: Getting Started).