30 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08Table 7. External Input Power Cable Terminations for the Eaton 93PM 150 kW Four-Wire SIAC-B (Continued)Terminal Function Terminal FunctionNumber and Sizeof PressureTermination(AWG or kcmil)TighteningTorqueNm (lb in)Size Screwand TypeAC Output to Critical Load E9 Phase A 2 – #6–300 31 (275) 5/16" HexE10 Phase B 2 – #6–300 31 (275) 5/16" HexE11 Phase C 2 – #6–300 31 (275) 5/16" HexE12 Neutral 2 – #6–300 31 (275) 5/16" HexBuilding, Inter-Cabinet, andLoad GroundTBG Ground 4 – #14–1/0 5.1 Nm (45) SlottedThe power wiring terminals E1 through E3 for the 93PM 200 kW Three-Wire SIAC-B are pressure terminations.Power wiring terminals E6 through E11 for the 93PM 200 kW Three-Wire SIAC-B are 2-hole bus bar mountingsfor standard NEMA 2-hole barrel lugs. The power wiring connections for this equipment are UL and CSA rated.See Table 8 for external power cable terminations, for supplied external wiring terminal hardware, and forrecommended installation parts and tools not supplied by Eaton.Figure 36 or Figure 37 show the location of the SIAC-B power cable terminals.Table 8. External Input Power Cable Terminations for the Eaton 93PM 200 kW Three-Wire SIAC-BTerminal Function Terminal FunctionNumber and Sizeof PressureTermination(AWG or kcmil)TighteningTorqueNm (lb in)Size Screwand TypeAC Input to RIB – Source 1(4-breaker version only)E1 (RIB–1) Phase A 2 – 3/0–250 42 (31) 5/16" HexE2 (RIB–3) Phase B 2 – 3/0–250 42 (31) 5/16" HexE3 (RIB–5) Phase C 2 – 3/0–250 42 (31) 5/16" HexAC Input to MaintenanceBypass – Source 2E6 Phase A 2 – 2 bolt mounting 35 (26) M12 Hex BoltE7 Phase B 2 – 2 bolt mounting 35 (26) M12 Hex BoltE8 Phase C 2 – 2 bolt mounting 35 (26) M12 Hex BoltAC Output to Critical Load E9 Phase A 2 – 2 bolt mounting 35 (26) M12 Hex BoltE10 Phase B 2 – 2 bolt mounting 35 (26) M12 Hex BoltE11 Phase C 2 – 2 bolt mounting 35 (26) M12 Hex BoltBuilding, Inter-Cabinet, andLoad GroundTBG Ground 4 – #14–1/0 5.1 Nm (45 lb in) SlottedThe power wiring terminals E1 through E3 for the 93PM 200 kW Four-Wire SIAC-B are pressure terminations.Power wiring terminals E6 through E11 for the 93PM 200 kW Four-Wire SIAC-B are 2-hole bus bar mountingsfor standard NEMA 2-hole barrel lugs. The power wiring connections for this equipment are UL and CSA rated.See Table 9 for external power cable terminations, for supplied external wiring terminal hardware, and forrecommended installation parts and tools not supplied by Eaton.Installation Plan and Unpacking