40 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 084. In the UPS cabinet, locate the harness cable ends marked UPS Bypass. Connect marked phase A, B, and Ccable ends to the corresponding bypass input terminals of the UPS.5. In the UPS cabinet if an RIB is installed, locate the harness cable ends marked UPS Input. Connect markedphase A, B, and C cable ends to the corresponding rectifier input terminals of the UPS.6. In the SIAC-B, locate the harness cable ends marked MIS. Connect marked phase A, B, and C terminalnumber cable ends to the corresponding terminal number of the MIS breaker.For a detailed view of the MIS breaker terminals, see Figure 22. Tighten terminals to 31Nm (275 lb in)torque.7. In the SIAC-B, locate the harness cable ends marked MIS. Connect marked phase A, B, and C terminalnumber cable ends to the corresponding terminal number of the MIS breaker.For a detailed view of the BIB breaker terminals, see Figure 23. Tighten terminals to 31Nm (275 lb in)torque.8. In the SIAC-B if and RIB is installed, locate the harness cable ends marked RIB. Connect marked phaseA, B, and C terminal number cable ends to the corresponding terminal number of the RIB breaker.For a detailed view of the RIB breaker terminals, see Figure 24. Tighten terminals to 31Nm (275 lb in)torque.9. If installing a four-wire SIAC-B, proceed to Step 10; otherwise, proceed to Step 15.NOTE When routing neutral cable harnesses, ensure the cable ends with the Gray and RedAnderson connectors are routed to the SIAC-B neutral connectors.10. Route the output and bypass neutral harnesses from the SIAC-B through the bottom of the SIAC-B andUPS inter-cabinet wiring access pass-through to the UPS cabinet terminals. See Figure 20 or Figure 21 forSIAC-B terminal locations. Refer to the applicable Eaton 93PM UPS Installation and Operation manual,listed in paragraph 1.7 For More Information, for the UPS pass-through and terminal locations.11. In the UPS cabinet, locate the harness cable ends marked UPS E12 Output. Connect marked cable ends tothe corresponding neutral terminals of the UPS.12. In the UPS cabinet, locate the harness cable ends marked UPS E12 Bypass. Connect marked cable ends tothe corresponding neutral terminals of the UPS.13. In the SIAC-B, locate the cable with the Gray Anderson connector and connect to the Gray Andersonconnector mounted to the cabinet sidewall (see Figure 20 or Figure 21).14. In the SIAC-B, locate the cable with the Red Anderson connector and connect to the Red Andersonconnector mounted to the cabinet sidewall (see Figure 20 or Figure 21).15. Proceed to paragraph 4.4.2 Installing SIAC-B Interface ConnectionsInstallation