44 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08Figure 24. 93PM SIAC-B RIB Output Terminal DetailRIBPhase A (RIB-2)Phase C (RIB-6)Phase B (RIB-4)AC Output toUPS Rectifier44..44..22 IInnssttaalllliinngg SSIIAACC--BB IInntteerrffaaccee CCoonnnneeccttiioonnssTo Install wiring:NOTE 1 The SIAC-B is typically attached to and directly integrated with the UPS cabinet at thefactory but it can be ordered and shipped separately from the UPS and installed onsite.This section must be used along with the applicable Eaton 93PM UPS Installation andOperation manual, listed in paragraph 1.7 For More Information, during installation.NOTE 2 The SIAC-B MBP auxiliary contact control interface wiring is prewired between theattached factory installed SIAC-B and UPS. Table 10 and Table 11, and Figure 25 throughFigure 30 are for reference only for the factory installed SIAC-B.NOTE 3 Keep interface wiring separate from power wiring.1. Locate the MBP interface harness removed from inside the SIAC-B in paragraph4.4.1 Installing SIAC-B Internal Power Wiring.NOTE When routing the MBP interface cable harness, ensure the green ten position terminalheader end is routed to the SIAC-B terminal block.2. Route the SIAC-B MBP auxiliary contact control interface wiring harnesses from the SIAC-B through thebottom of the SIAC-B and UPS inter-cabinet wiring access pass-through to the UPS cabinet terminals. SeeFigure 25 or Figure 26 for SIAC-B terminal locations, and Figure 28 or Figure 29 for UPS terminal locations.Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph1.7 For More Information, for the UPS pass-through location.3. Connect the MBP interface harness green ten position header to the SIAC-B green terminal block.Installation