Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08 31Figure 36 or Figure 37 show the location of the SIAC-B power cable terminals.Table 9. External Input Power Cable Terminations for the Eaton 93PM 200 kW Four-Wire SIAC-BTerminal Function Terminal FunctionNumber and Sizeof PressureTermination(AWG or kcmil)TighteningTorqueNm (lb in)Size Screwand TypeAC Input to RIB – Source 1(4-breaker version only)E1 (RIB–1) Phase A 2 – 3/0–250 42 (31) 5/16" HexE2 (RIB–3) Phase B 2 – 3/0–250 42 (31) 5/16" HexE3 (RIB–5) Phase C 2 – 3/0–250 42 (31) 5/16" HexAC Input to MaintenanceBypass – Source 2E6 Phase A 2 – 2 bolt mounting 35 (26) M12 Hex BoltE7 Phase B 2 – 2 bolt mounting 35 (26) M12 Hex BoltE8 Phase C 2 – 2 bolt mounting 35 (26) M12 Hex BoltE12 Neutral 4 – 2 bolt mounting 35 (26) M12 Hex BoltAC Output to Critical Load E9 Phase A 2 – 2 bolt mounting 35 (26) M12 Hex BoltE10 Phase B 2 – 2 bolt mounting 35 (26) M12 Hex BoltE11 Phase C 2 – 2 bolt mounting 35 (26) M12 Hex BoltE12 Neutral 4– 2 bolt mounting 35 (26) M12 Hex BoltBuilding, Inter-Cabinet, andLoad GroundTBG Ground 4 – #14–1/0 5.1 Nm (45 lb in) Slotted33..33..44 SSIIAACC--BB IInntteerrffaaccee WWiirriinngg PPrreeppaarraattiioonnControl wiring for features and options should be connected at the customer interface terminal block locatedinside the SIAC-B.WARNINGDo not directly connect relay contacts to the mains related circuits. Reinforced insulation to the mains isrequired.Read and understand the following notes while planning and performing the installation:• Use Class 1 wiring methods (as defined by the NEC) for interface wiring from 30V to 600V. The wireshould be rated for 600V, 1A minimum. 12 AWG maximum wire size.• Use Class 2 wiring methods (as defined by the NEC) for interface wiring up to 30V. The wire should berated for 24V, 1A minimum.• Use twisted-pair wires for each input and return or common.• All interface wiring and conduit is to be supplied by the customer.• Interface wiring can be installed using the inter-cabinet wiring access pass-through or by routing wiringthrough conduit between cabinets.• Install the interface wiring in separate conduit from the power wiring.Installation Plan and Unpacking