62 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08Figure 38. 93PM SIAC-B RIB Terminal DetailRIBPhase APhase CPhase BAC Input toUPS Rectifier(Source 1)44..99 IInniittiiaall SSttaarrttuuppStartup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or thewarranty terms specified in Chapter 9 Warranty become void. This service is offered as part of the salescontract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice isrequired) to reserve a preferred startup date.44..1100 CCoommpplleettiinngg tthhee IInnssttaallllaattiioonn CChheecckklliissttThe final step in installing the SIAC-B is completing the following Installation Checklist. This checklist ensuresthat you have completely installed all hardware, cables, and other equipment. Complete all items listed on thechecklist to ensure a smooth installation. Make a copy of the Installation Checklist before filling it out, andretain the original.After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPSsystem and commission it to support the critical load. The service representative cannot perform anyinstallation tasks other than verifying software and operating setup parameters. Service personnel may requesta copy of the completed Installation Checklist to verify all applicable equipment installations have beencompleted.NOTE The Installation Checklist MUST be completed prior to starting the UPS system for thefirst time.44..1111 IInnssttaallllaattiioonn CChheecckklliisstto All packing materials and restraints have been removed from each cabinet.o The SIAC-B is joined to the UPS cabinet.Installation