CHAPTER 6: COMMISSIONING 6.5 INDICATORSGEK-113000-AF F650 DIGITAL BAY CONTROLLER 6-56.5 IndicatorsFeed the relay and verify that when commanding a LED reset operation, all LED indicators light up and they are turned offwhen pressing the ESC key for more than 3 seconds.6.6 Power supply testingFeed the relay with the minimum and maximum voltage. For each voltage value, verify that the alarm relay is activatedwhen there is voltage, and it is deactivated when there is no feed. If the power supply source incorporates AC feed, this testis also performed for VAC.If the relay incorporates a redundant power supply, these tests shall be performed on both power supplies.Voltage values to be applied are the ones indicated below according to the relay model:NOTE: Codes HIR and LOR correspond to a redundant power supply6.7 CommunicationsVerify that available communication ports allow communication with the relay.Ports to be checked are as follows:Front:RS232Rear:2 x RS485, 2 x Fiber Optic - Serial, 2 x Fiber Optic - Ethernet, 1 x RJ45 - Ethernet .A computer with EnerVista 650 Setup software and an appropriate connector must be used.SUPPLY V min. V max.HI/HIR110-250 Vdc120-230 Vac88 Vdc96 Vac300 Vdc250 VacLO/LOR24-48 Vdc 19.2 Vdc 57.6 Vdc