Installation checklist 577Installation checklistContents of this chapterThis chapter contains the task list to be followed after the mechanical and electricalinstallation before proceeding to starting up the drive.Checking the installationCheck the mechanical and electrical installation of the drive before start-up. Gothrough the checklist below together with another person. Read chapter Safety onpage 15 of this manual before you work on the drive.CheckMECHANICAL INSTALLATIONThe ambient operating conditions are allowed. (See Mechanical installation: Checking theinstallation site on page 29 as well as Technical data: Losses, cooling data and noise onpage 393 and Ambient conditions on page 397.)The drive is fixed properly on an even vertical non-flammable wall. (See Mechanicalinstallation on page 29.)The cooling air will flow freely. (See Mechanical installation: Free space around the driveon page 30.)The motor and the driven equipment are ready for start. (See Planning the electricalinstallation: Checking the compatibility of the motor and drive on page 36 as well asTechnical data: Motor connection data on page 395.)ELECTRICAL INSTALLATION (See Planning the electrical installation on page 35 andElectrical installation on page 45.)For ungrounded and corner grounded systems: The internal EMC filter is disconnected(EMC screw removed).The capacitors are reformed if the drive has been stored over a year.The drive is grounded properly.The input power voltage matches the drive nominal input voltage.