9702/11 MN05006002Z-EN4 CommissioningThe commissioning of an SmartWire-DT network alwaystakes place in connection with the SmartWire-DT gatewayand the overriding controller (PLC) with its field bus connec-tion.Commissioning of the various SmartWire-DT gateways andcontrollers are described in separate manuals.• MN05013002Z-EN, „SmartWire-DT Gateways“(previously AWB2723-1612en)• MN05003001Z-EN(previously AWB2724-1491GB)Modular PLC XC-CPU201… (among other things with theconnection for the CANopen field bus)• MN050020002Z-EN(previously AWB2725-1452GB)XI/OC signal modules (among other things with theconnection for the PROFIBUS DP field bus).The manuals are available for download on the Internet asPDF files.They can be quickly located athttp://www.moeller.net/en/supportby entering the document number as the search term.j Danger!Before the commissioning the SmartWire-DT system mustbe completely mounted and wired.www.comoso.com