4702/11 MN05006002Z-EN3 InstallationThe SmartWire-DT components must only be installed andconnected up by trained electricians or other persons whoare familiar with the mounting of electrical equipment.The SmartWire-DT components are installed in the followingorder:• Mechanical mounting of the SmartWire-DT elements• Mechanical mounting of the SmartWire-DT cables andfield bus cable (PROFIBUS-DP or CANopen)• Electrical installation of the supply voltages• Electrical installation of the sensors and actuators on theSmartWire-DT I/O module.When using contactors:• Electrical installation of the control voltage for the contac-torsj Danger of electric shock!Never carry out electrical work on the device while thepower supply is switched on.Always follow the safety rules:• Switch off and isolate.• Verify isolation from the supply.• Secure against retriggering.• Short-circuit and ground.• Cover adjacent live parts.www.comoso.com