Hours Min.Procedure: Table: 003GTH-4013 SXGTH-4017 SXMay 2008 Section 7 - Repair ProceduresDocument 57.4403.4200 GTH-4013 SX GTH-4017 SX 11TABLE 003Removing the engine from themachineBridge crane, payload 500 kgTextile bridles or chains with hooksStandard tools3402 302Operation:1 Open the engine cover.2 Secure the engine cover to a bridge crain usinga textile bridle3 Using two 13mm wrenches, remove the twoscrews of the spring (A).4 Again with two 13mm wrenches, loosen the fivescrews (B) that secure the cover to the frame ofthe machine.5 Remove the upper cover.6 Disconnect the two battery leads and removethe battery using a 13mm wrench and a 4mmAllen wrench; remove the two screws of enginefuse box using a 10mm combination wrench.7 Using two 17mm wrenches, remove the sixscrews fixing the lower cover of the engine8 Remove the lower cover using a stacker.9 With a screwdriver, disconnect the fuel feedingand return piping held in position by the specialhose-clamps347AB9Courtesy of Crane.Market