1.3 Product documentation1.3.1 Product documentation set GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v16IEC07000220-4-en.vsdPlanning & purchaseEngineeringInstallingCommissioningOperationMaintenanceDecommissioningDeinstalling & disposalApplication manualOperation manualInstallation manualEngineering manualCommunicationprotocol manualCyber securitydeployment guidelineTechnical manualCommissioning manualIEC07000220 V4 EN-USFigure 1: The intended use of manuals throughout the product lifecycleThe engineering manual contains instructions on how to engineer the IEDs usingthe various tools available within the PCM600 software. The manual providesinstructions on how to set up a PCM600 project and insert IEDs to the projectstructure. The manual also recommends a sequence for the engineering ofprotection and control functions, as well as communication engineering for IEC61850.The installation manual contains instructions on how to install the IED. Themanual provides procedures for mechanical and electrical installation. The chaptersare organized in the chronological order in which the IED should be installed.The commissioning manual contains instructions on how to commission the IED.The manual can also be used by system engineers and maintenance personnel forassistance during the testing phase. The manual provides procedures for thechecking of external circuitry and energizing the IED, parameter setting andconfiguration as well as verifying settings by secondary injection. The manualSection 1 1MRK 511 407-UEN CIntroduction14 Phasor measurement unit RES670 2.2 IECApplication manual