describes the process of testing an IED in a substation which is not in service. Thechapters are organized in the chronological order in which the IED should becommissioned. The relevant procedures may be followed also during the serviceand maintenance activities.The operation manual contains instructions on how to operate the IED once it hasbeen commissioned. The manual provides instructions for the monitoring,controlling and setting of the IED. The manual also describes how to identifydisturbances and how to view calculated and measured power grid data todetermine the cause of a fault.The application manual contains application descriptions and setting guidelinessorted per function. The manual can be used to find out when and for what purposea typical protection function can be used. The manual can also provide assistancefor calculating settings.The technical manual contains operation principle descriptions, and lists functionblocks, logic diagrams, input and output signals, setting parameters and technicaldata, sorted per function. The manual can be used as a technical reference duringthe engineering phase, installation and commissioning phase, and during normalservice.The communication protocol manual describes the communication protocolssupported by the IED. The manual concentrates on the vendor-specificimplementations.The point list manual describes the outlook and properties of the data pointsspecific to the IED. The manual should be used in conjunction with thecorresponding communication protocol manual.The cyber security deployment guideline describes the process for handling cybersecurity when communicating with the IED. Certification, Authorization with rolebased access control, and product engineering for cyber security related events aredescribed and sorted by function. The guideline can be used as a technicalreference during the engineering phase, installation and commissioning phase, andduring normal service.1.3.2 Document revision history GUID-C8027F8A-D3CB-41C1-B078-F9E59BB73A6C v7Document revision/date History–/May 2017 First releaseA/October 2017 Information updatedB/March 2018 2.2 Maintenance release 1C/June 2018 Added new functions and resolved bugs1MRK 511 407-UEN C Section 1IntroductionPhasor measurement unit RES670 2.2 IEC 15Application manual