B30 BUS DIFFERENTIAL SYSTEM – INSTRUCTION MANUAL 3-1B30 Bus Differential SystemChapter 3: InstallationInstallationThis chapter outlines installation of hardware and software. You unpack, check, mount, wire the unit, turn on power, theninstall the software and configure settings.3.1 Unpack and inspectUse this procedure to unpack and inspect the unit.1. Open the relay package and check that the following items have been delivered:– B30– Mounting screws– GE EnerVista™ DVD (software and documentation)– B30 Instruction Manual (soft copy on DVD; printed copy if ordered)– UR Family Communications Guide (soft copy on DVD; printed copy if Instruction Manual ordered)– Certificate of Calibration– Test Report– EC Declaration of Conformity– Front panel label package2. Inspect the unit for physical damage.3. View the rear nameplate and verify that the correct model has been delivered. The model number is at the top right.4. Any protective plastic film on the front panel is normally peeled off, but also can be left on.5. For any issues, contact GE as outlined in the For Further Assistance section in chapter 1.6. Check that you have the latest copy of the B30 Instruction Manual and the UR Family Communications Guide, for theapplicable firmware version, at http://www.gegridsolutions.com/multilin/manuals/index.htm