Part No. 32960 Genie Z-45/22 4 - 17Service Manual - Second Edition Section 4 - Scheduled Maintenance ProceduresTABLE B PROCEDURES2 Loosen the lock nut, then turn the adjustmentscrew clockwise to increase the rpm orcounterclockwise to decrease the rpm. Tightenthe lock nut and recheck the rpm.a solenoid bootb high idle adjustment nutc lock nutd yokee low idle adjustment screwf lock nut3 Move the engine idle control switch to high idle(rabbit symbol) from the ground controls.Result: High idle should be 2300 rpm.If high idle rpm is correct, disregardadjustment step 4.4 Loosen the yoke lock nut, then turn theadjustment nut and solenoid bootcounterclockwise to increase the rpm orclockwise to decrease the rpm. Tighten theyoke lock nut and recheck the rpm.Deutz Diesel modelsLow idle 1300 rpmHigh idle 2300 rpmfec dbaB-13Test the Key SwitchProper key switch action and response is essentialto safe machine operation. The machine can beoperated from the ground or platform controls andthe activation of one or the other is accomplishedwith the key switch. Failure of the key switch toactivate the appropriate control panel could causea hazardous operating situation.1 Pull out the Emergency Stop button to theonposition at both the ground and platformcontrols.2 Turn the key switch to ground control, start theengine and then turn the key switch toplatform control.3 Operate each machine function from theground controls.Result: The machine functions should notoperate.4 Turn the key switch to ground control.5 Operate each machine function from theplatform controls.Result: The machine functions should notoperate.6 Turn the key switch to theoff position.Result: The engine should stop and nofunctions should operate.Deutz Diesel models: All functionsshould stop immediately. Theengine will shut off after 2 to 3seconds.800-610-4101ActionRental.com