73The job queue viewProgress counter The semantics of the progress counter depends on thesorting method of the job.■ The job is set to sort 'By set'.The progress counter is the number of the printedset followed by the required number of sets. A slash(/) separates the two numbers.■ The job is set to sort 'By page'.The progress counter is the number of printedsheets followed by the required number of sheetsfor each original. A slash (/) separates the twonumbers.Note: Streaming jobs do not have aprogress counter. Only the total number ofprinted pages is displayed. Forprint-while-RIP jobs, the progress counterdisplays the number of printed sets.Original counter The original counter shows the number of scannedpages in the job. When you scan a document, thecounter shows the number of scans.When you use the Set-build key , the total numberof scanned pages in the set is displayed.Note: Streaming jobs do not have anoriginal counter. For Print-while-RIP jobs,the counter increases after a page is ripped.Time to finish estimate The time to finish estimate is the time that it will taketo print the jobs if the process is not interrupted. Thistime is indicated in hours and minutes (hh:mm). Thetime is cumulative. The minimum time to finish that isdisplayed is 1 minute.Scan jobs, jobs on hold and jobs that need operatoraction have no time to finish estimate displayed.Note: For streaming jobs andprint-while-RIP jobs, the time to finishestimate is not indicated.[28] Job icon information (2 – 2)Information displayed with thejob iconDescription