City Series CV60E-1 | 81installationCITY SERIESEXTENDED VIEW PANEL INSTALLATION2. Locate mounting holes in locations shown below and remove nailingstrips (if already installed).4. Move unit into framed opening at desired height and level unit onall sides. Connect gas and electrical (see manual).5. Install a second stud as shown. The distance from first to secondstud should be 8-1/2"installation919-809 07.05.171. Construct the sealed rear enclosure to specified width shown belowand desired height (see unit manual for detailed framing instructions).2. Locate mounting holes in locations shown below and remove nailingstrips (if already installed).3. Attach left and right base panels using 2 screws on each side. Re-move drywall finishing edge from right and left side of window open-ing using supplied right-angle screwdriver.4. Move unit into framed opening at desired height and level unit on allsides. Connect gas and electrical (see manual).EXTENDED VIEW PANEL INSTALLATIONMountingholesEnclosure width:CV40E - 46-3/4"CV60E - 65-11/16"CV72E - 78"Attach base panelsInstall second stud--8.5" out from first stud8.5" from stud center tostud centerSecure base panels5. Install a second stud as shown. The distance from first to secondstud should be 8-1/2".6. Secure base panels in place with 5 screws on each side.8-1/2"1CITY SERIESExtended View Panel Installationinstallation919-809 07.05.171. Construct the sealed rear enclosure to specified width shown belowand desired height (see unit manual for detailed framing instructions).2. Locate mounting holes in locations shown below and remove nailingstrips (if already installed).3. Attach left and right base panels using 2 screws on each side. Re-move drywall finishing edge from right and left side of window open-ing using supplied right-angle screwdriver.4. Move unit into framed opening at desired height and level unit on allsides. Connect gas and electrical (see manual).EXTENDED VIEW PANEL INSTALLATIONMountingholesEnclosure width:CV40E - 46-3/4"CV60E - 65-11/16"CV72E - 78"Attach base panelsInstall second stud--8.5" out from first stud8.5" from stud center tostud centerSecure base panels5. Install a second stud as shown. The distance from first to secondstud should be 8-1/2".6. Secure base panels in place with 5 screws on each side.8-1/2"1CITY SERIESExtended View Panel Installation1. Construct the sealed rear enclosure to specified width shown belowand desired height (see unit manual for detailed framing instructions).installation919-809 07.05.171. Construct the sealed rear enclosure to specified width shown belowand desired height (see unit manual for detailed framing instructions).2. Locate mounting holes in locations shown below and remove nailingstrips (if already installed).3. Attach left and right base panels using 2 screws on each side. Re-move drywall finishing edge from right and left side of window open-ing using supplied right-angle screwdriver.4. Move unit into framed opening at desired height and level unit on allsides. Connect gas and electrical (see manual).EXTENDED VIEW PANEL INSTALLATIONMountingholesEnclosure width:CV40E - 46-3/4"CV60E - 65-11/16"CV72E - 78"Attach base panelsInstall second stud--8.5" out from first stud8.5" from stud center tostud centerSecure base panels5. Install a second stud as shown. The distance from first to secondstud should be 8-1/2".6. Secure base panels in place with 5 screws on each side.8-1/2"1CITY SERIESExtended View Panel Installation3. Attach left and right base panels using 2 screws on each side.Remove drywall finishing edge from right and left sides of windowopening using supplied right-angle screwdriver.installation919-809 07.05.171. Construct the sealed rear enclosure to specified width shown belowand desired height (see unit manual for detailed framing instructions).2. Locate mounting holes in locations shown below and remove nailingstrips (if already installed).3. Attach left and right base panels using 2 screws on each side. Re-move drywall finishing edge from right and left side of window open-ing using supplied right-angle screwdriver.4. Move unit into framed opening at desired height and level unit on allsides. Connect gas and electrical (see manual).EXTENDED VIEW PANEL INSTALLATIONMountingholesEnclosure width:CV40E - 46-3/4"CV60E - 65-11/16"CV72E - 78"Attach base panelsInstall second stud--8.5" out from first stud8.5" from stud center tostud centerSecure base panels5. Install a second stud as shown. The distance from first to secondstud should be 8-1/2".6. Secure base panels in place with 5 screws on each side.8-1/2"1CITY SERIESExtended View Panel InstallationInstall second stud--8.5" out from first stud8.5" from stud center tostud center8-1/2"Secure base panels6. Secure base panels in place with 5 screws on each side.Extended View Panel Installation