4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 10 452. If you are rack-mounting the EBM cabinet, refer to the UPS rack-mount installation procedure (see2.6 Rack-Mount Installation ). If not, proceed to the next step.3. Install the anchor brackets to the floor if applicable (see 2.5 Anchor Bracket Installation ).4. Push in the EBM DC emergency disconnect switch on the rear EBM panel and turn the switch lockout key(see Figure 37 ).NOTE The UPS and EBM AC/DC terminal covers are shipped in the UPS and EBM accessorykit and do not come installed on the UPS or EBM chassis.1. Route the EBM DC input/output cables to the terminal blocks as shown in (Figure 38).NOTE Torque the screws holding all input and output power conductors to the values specifiedin Table 2 .2. Connect the EBM DC Cables to the applicable terminals by removing and reinstalling the screws onto theterminal blocks. See Figure 38.Figure 38. Standard EBM to UPS ConnectionsEBM TerminalBlocksUPS/EBMTerminalBlockFrom previousEBM(if installed)CN4EBM UPSDC+DC-DC+DC-ScrewsCoverDC+ DC- DC- DC+To UPSDC input cables fromupstream EBM(if installed)TerminalBlockStandard Battery Cabinet Installation