4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 10 552. If you are rack-mounting the EBM cabinet, refer to the UPS rack-mount installation procedure (see2.6 Rack-Mount Installation ). If not, proceed to the next step.3. Install the anchor brackets to the floor if applicable (see 2.5 Anchor Bracket Installation ).4. Push in the EBM DC emergency disconnect switch on the rear EBM panel and turn the switch lockout key.5. Route the EBM DC input/output cables to the terminal blocks as shown in (Figure 49).NOTE Torque the screws holding all input and output power conductors to the values specifiedin Table 2 .6. Connect the EBM DC Cables to the applicable terminals by removing and reinstalling the screws onto theterminal blocks. See Figure 49.Figure 49. Connected EBM ( Split Phase Input)From previousEBM(if installed)CN3CN4 CN4EBM UPSDC+DC- DC+DC-L1 GNL2N L1GL2Screws ScrewsGroundLugCoverDC+ DC- DC- DC+ G L1 N L2To UPSDC input cables fromupstream EBM(if installed)TerminalBlockTerminalBlock7. Reinstall the AC and DC terminal covers.8. If additional battery cabinets are to be connected to the first, in a daisy-chain configuration, connect eachEBM with the DC cables supplied in the EBM accessory kit.Connected Battery Cabinet With Split Phase Input