Part No. 34032 Genie S-80 & Genie S-85 7 - 47Service Manual - First Edition Section 7 - Repair Procedures3 Loosen the jam nut on the adjustable endof the tie rod cylinder.4 Remove the pin retaining fasteners, thenremove the pivot pin from the adjustable end ofthe tie rod cylinder.5 Slide the tie rod cylinder off the yoke and adjustit by turning the end.One turn on the adjustable endequals approximately 1 /8 inch(3.2 mm) change in the frontand rear measurements.6 Slide the tie rod onto the yoke. Install thepivot pin, then install the retaining bolt.7 Tighten the jam nut against the tie rod.8 Recheck the front and back measurements(step 2). If further adjustment is needed, repeatsteps 3 through 7.Toe-in specification 0 ± 1/ 8 inch (6.35 mm)13-3Tie Rod CylinderHow to Remove theTie Rod Cylinder1 Disconnect and plug the hydraulic hoses fromthe tie rod cylinder. Cap the fittings.Bodily injury hazard. Sprayinghydraulic oil can penetrate andburn skin. Loosen hydraulicconnections very slowly to allowthe oil pressure to dissipategradually. Do not allow oil tosquirt or spray.2 Remove the pin retaining fasteners, thenremove the pivot pin from each end of the tierod cylinder.3 Remove the tie rod cylinder.How to Perform the Toe-inAdjustmentPerform this procedure on afirm, level surface. Block thenon-steering tires and be surethat the machine is in thestowed position.1 Straighten the steer wheels.2 Measure the steer tires, front to front and backto back, using a measuring fixture.2WD STEERING AXLE COMPONENTS