Chapter 12 Installing, Removing, and ReplacingPreparing the Library for Moving or ShippingScalar i500 User’s Guide 484Preparing the Library for Moving or ShippingBefore you move or ship your library, follow these steps:1 Save the library configuration (see Saving the Library Configurationon page 495).2 Shut down the library using the local operator panel (Operations >System Shutdown). This lowers the robot to the “shipping” positionon the floor of the library.3 Follow instructions on the operator panel screen.4 Turn off library power by pressing the power button on the frontpanel.5 Turn off the power to each power supply on the back of the library.6 Install the orange robot restraint assembly that secures the robot tothe floor of the library. The robot restraint assembly was part of thepackaging that originally came with the library.7 Remove all cords and cables from the rear of the library.Caution: When moving the library: Manufacturer-suppliedpackaging, whether original or purchased, is required forcomplete or partial de-installations. You must install theorange robot restraint assembly to protect the robotagainst damage. Use the original shipping carton andpackaging materials to further protect your libraryequipment during transport.Not using the requiredpackaging will potentially void the support contract. Anydamage to equipment will require re-certification, or forQuantum to repair any damage to the equipment, or both.Quantum offers de-installation services. Please contactyour Quantum Authorized Reseller or local QuantumRepresentative for further details.Caution: When shipping the library: Use the shipping carton,packaging materials, and the orange robot restraintassembly that originally came with the library. This willhelp protect your library against damage.