1. Mount the mounting rail! Please consider that a clearance from the middle of themounting rail of at least 80mm above and 60mm below, respectively 80mm bydeployment of shield bus carriers, exist.2. Mount your head module such as CPU or field bus coupler.3. Before mounting the periphery modules you have to remove the bus cover at theright side of the Head module by pulling it forward. Keep the cover for latermounting.4. For mounting turn the locking lever of the module upward until it engages.5. For mounting place the module to the module installed before and push the moduleto the mounting rail guided by the strips at the upper and lower side of the module.6. Turn the locking lever of the periphery module downward, again.Mounting peripherymodulesVIPA System SLIOBasics and mountingMounting periphery modulesHB300 | FM | 054-1DA00 | en | 18-0618