2. Plug one end of the power cord (6 in “Connecting the Host Interface Cable”on page 4-11) into each power supply connector on the back panel of thelibrary.3. Plug the other end of each power cord into the nearest properly groundedpower outlet. Use separate power sources for each power supply for redundantpower.Attention: To disconnect all power from the library, remove the power cordfrom each outlet. The power button removes power from portions of the libraryand the drives, but the power supplies still have AC power at their inputs.4. Remove the protective plastic on the exterior surfaces of the library.5. Turn ON the library using the power button. Check the Operator Control Paneldisplay to make sure the library is receiving power. If it is not, check the powerconnections and your power source. During the Power-On Self Test (POST), allfour LEDs are illuminated briefly, followed by a flashing Ready LED. When theinitialization sequence is complete, the Home screen (see “Power-ON Display”on page 2-2) will be displayed.Configuring Your LibraryNote: Review the information in "Installation Planning" before configuring yourlibrary.The library can be configured using the Operator Control Panel and/or the WebUser Interface. The recommended method for configuring your library is using theWeb User Interface.For complete detailed configuration information on all of the functions available onyour library using both the Operator Control Panel and the Web User Interface, seeChapter 5, “Operations,” on page 5-1. For default library settings, see “Configure:Save/Restore” on page 5-27Choosing Your Configuration MethodIf you choose to use the factory defaults for your library configuration, go to“Using Factory Defaults as Your Configuration.”If you choose to use the Web User Interface for configuring your library, go to“Configuring Your Library using the Web User Interface” on page 4-15.If you choose to use the Operator Control Panel for configuring your library, go to“Configuring Your Library using the Operator Control Panel” on page 4-31.Write down all library configuration settings on the Appendix G, “LibraryConfiguration Form,” on page G-1 for future reference.Using Factory Defaults as Your ConfigurationThe table below shows the main default library settings. If you wish to use thedefaults, no other changes need to be made before using your libraryItem Default SettingLogical Libraries 1Active Slots MaximumI/O Slots Enabled4-14 Dell PowerVault TL2000 Tape Library and TL4000 Tape Library User's Guide