4 Creating a planned SmartWire-DTSmartWire-DT configuration in SWD-Assist4.1 Select gateway as field bus moduleSmartWire-DT Gateway EU5C-SWD-EIP-MODTCP 08/17 MN120003Z EN www.eaton.com 334 Creating a planned SmartWire-DTSmartWire-DT configuration in SWD-AssistSWD lines that use an EU5C-SWD-EIP-MOD-TCP gateway are created withSWD-Assist version 1.40 or higher. SWD-Assist is used to select both thegateway and all required SmartWire-DT modules. It is also used to configureall the settings for the field bus, as well as the parameter settings for the indi-vidual SmartWire-DT modules, which are then loaded onto the gateway as aplanned SmartWire-DT configuration.To create an SWD line for an EtherNet/IP field bus using the SWD-Assistplanning program, you will need to follow the steps below:1 Select the EU5C-SWD-EIP-MODTCP gateway and configure its parame-ters2 Select the SmartWire-DT modules you want and configure their parame-ters3 Select the EtherNet/IP or Modbus/TCP field bus communications proto-col4 Specify the device names for the gateway and the modules5 Transfer the planned SmartWire-DT configuration to the gateway6 Export the input/output data to a CSV or text file4.1 Select gateway as field bus module▶ Start SWD-Assist and create a new project. An EU5C-SWD-DP PROFI-BUS gateway will be shown on the workspace by default.▶ Select the EU5C-SWD-EIP-MODTCP gateway from the catalog ofdevices and drag it to the canvas.The EU5C-SWD-DP gateway will be replaced with an EU5C-SWD-EIP-MODTCP gateway.→ If any changes are made to the modules, parameters, or inregard to the field bus protocol, the planned SmartWire-DT con-figuration will have to be transferred again.