Critical PowerModifications reserved Page 109/146GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx User Manual TLE Series 600 & 800 CE S1NOTE !Ensure the LED 1 (Rectifier) is lit before carrying out this procedure.It indicates that the DC-Link has reached 800Vdc (see screen MEASURES / Rectifier)!2. Connect the Battery to the UPS by closing the“External Battery Protections”.NOTE !Before performing the next procedure make sure that the LED 3 (Booster/Battery charger) islit.3. Insert the Inverter performing the command “Inverter ON".Perform the “Inverter ON” command from the screen:Commands 1 / Inverter / ON. Soft-start of Inverter indicated with blinking LED 2 (Inverter). At the end of Soft-start the LED 2 (Inverter) remains lit. The Load is automatically transferred from Automatic Bypass to Inverter. LED ALARM turns Off and the LED LOAD PROTECTED must be lit.The Synoptic Diagram must display the status“LOAD SUPPLIED BY INVERTER”.END OF PROCEDURE