Critical PowerModifications reserved Page 44/146GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx User Manual TLE Series 600 & 800 CE S1TLE Series 800 - Control cables interconnectionFig. 5.7.3-4 TLE Series 800 – Control cables interconnectionPos. Connection From To1 XD1 – HAN Connector male (46 poles) “Power Section cabinet” “In/Out Section cabinet”2 XD2 - HAN Connector male (32 poles) “Power Section cabinet” “In/Out Section cabinet”3 XTR2A - Connector “Power Section cabinet” “In/Out Section cabinet”XTR2 ConnectorFig. 5.7.3-5 Connection of hearting connectors (HAN connectors)NOTE: All these connections must be performed byQUALIFIED SERVICE PERSONNEL only.Proper dressing needs to be done for each cableassembly in order to reduce the stress.All the cables must be sufficiently (at least 10cm/4")away from all live parts.Cable binders used to support the wiring must NOT beoverly tightened.In/Out Section cabinetXD1(46 poles)Power Section cabinetXD2(32 poles)XD1(46 poles)XD2(32 poles)XD1 Connector (46 poles)XD2 Connector (32 poles)1 2TLES_800_S1_UPS connection cabinets_GE_03GB12