Part No. 75861 Genie Z-60/34 3 - 7November 2003 Section 3 • Scheduled Maintenance ProceduresREV AA-1Perform Pre-operationInspectionCompleting a pre-operation inspection is essentialto safe machine operation. The pre-operationinspection is a visual inspection performed by theoperator prior to each work shift. The inspection isdesigned to discover if anything is apparently wrongwith a machine before the operator performs thefunction tests. The pre-operation inspection alsoserves to determine if routine maintenanceprocedures are required.Complete information to perform this procedure isavailable in the Genie Z-60/34 Operator's Manualon your machine.Checklist A ProceduresA-2Perform Engine Maintenance -Deutz ModelsEngine specifications require thatthis procedure be performed dailyor every 10 hours, whichevercomes first.Proper engine maintenance, following the enginemanufacturer's maintenance schedule, is essentialto good engine performance and service life. Failureto perform the maintenance procedures can lead topoor engine performance and component damage.Required maintenance procedures and additionalengine information are available in theDeutz FL 1011F Operation Manual(Deutz part number 0297 9683).Deutz FL 1011F Operation ManualGenie part number 52883To access the engine:1 Remove the two engine pivot plate retainingbolts. Swing the engine pivot plate out awayfrom the machine and secure it from moving.Crushing hazard. Failure to securethe engine pivot plate from movingcould result in death or seriousinjury.