3 - 36 Genie Z-60/34 Part No. 75861November 2003Section 3 • Scheduled Maintenance ProceduresREV AC-1Perform Engine Maintenance -Deutz ModelsDeutz engine specifications requirethat this procedure be performedevery 500 hours.Proper engine maintenance, following the enginemanufacturer's maintenance schedule, is essentialto good engine performance and service life. Failureto perform the maintenance procedures can lead topoor engine performance and component damage.Required maintenance procedures and additionalengine information are available in theDeutz FL 1011F Operation Manual(Deutz part number 0297 9683).Deutz FL 1011F Operation ManualGenie part number 52883To access the engine:1 Remove the two engine pivot plate retainingbolts. Swing the engine pivot plate out awayfrom the machine and secure it from moving.Crushing hazard. Failure to securethe engine pivot plate from movingcould result in death or seriousinjury.C-2Grease the Platform OverloadMechanism (if equipped)Genie specifications requirethat this procedure be performedevery 500 hours or 6 months,whichever comes first. Performthis procedure more often if dustyconditions exist.Application of lubrication to the platform overloadmechanism is essential to safe machine operation.Continued use of an improperly greased platformoverload mechanism could result in the system notsensing an overloaded platform condition and willresult in component damage.1 Locate the grease fittings on each pivot pin ofthe platform overload assembly.2 Thoroughly pump grease into each grease fittingusing a multi-purpose grease.If your machine is not equippedwith grease fittings on the pivotpins, remove the pivot pins andgrease them.Checklist C Procedures