Part No. 75861 Genie Z-60/34 4 - 17November 2003 Section 4 • Repair ProceduresREV A4-2Primary BoomHow to Remove thePrimary BoomBodily injury hazard. Thisprocedure requires specific repairskills, lifting equipment and asuitable workshop. Attempting thisprocedure without these skills andtools could result in death orserious injury and significantcomponent damage. Dealerservice is strongly recommended.Perform this procedure with theboom in the stowed position.When removing a hose assemblyor fitting, the O-ring on the fittingand/or hose end must be replacedand then torqued to specificationduring installation.Refer to Section Two, HydraulicHose and Fitting TorqueSpecifications.1 Remove the platform.2 Remove the platform rotator and platformmounting weldment.3 Remove the jib boom.See 3-1, How to Remove the Jib Boom.4 Remove cable track.See 4-1, How to Remove the Cable Track.5 Remove the hose and cable clamp from theupper mid-pivot.How to Repair the Primary BoomCable TrackComponent damage hazard. Theprimary boom cable track can bedamaged if it is twisted.A 7 link repair section of cabletrack is available through theGenie Industries Service PartsDepartment.a link separation pointb lower clip1 Use a slotted screwdriver to pry down on thelower clip.2 To remove a single link, open the lower clipand then use a screw driver to pry the link tothe side.3 Repeat steps 1 and 2 for each link.abPRIMARY BOOM COMPONENTS