Part No. 75861 Genie Z-60/34 3 - 31November 2003 Section 3 • Scheduled Maintenance ProceduresREV A6 Continue at full speed and note the time whenthe machine reference point crosses the finishline.7 Press down the foot switch and lower the boomto the stowed position.8 Extend the boom 1 foot / 30 cm.9 Choose a point on the machine; i.e., contactpatch of a tire, as a visual reference for usewhen crossing the start and finish lines.10 Bring the machine to top drive speed beforereaching the start line. Begin timing when yourreference point on the machine crosses thestart line.11 Continue at top speed and note the time whenthe machine reference point crosses the finishline. Refer to Section 2, Specifications.B-19Test the Alarm Package(if equipped)The alarm package includes:· Travel alarm· Descent alarm· Flashing beaconsAlarms and beacons are installed to alert operatorsand ground personnel of machine proximity andmotion. The alarm package is installed on theturntable rear cover. Beacons are installed on bothturntable covers.The alarms and beacons willoperate with the enginerunning or not running.1 Turn the key switch to ground controls and pullout the red Emergency Stop button to the onposition at both the ground and platformcontrols.Result: Both flashing beacons should be on andflashing.2 Hold the function enable switch to either sideand activate the boom toggle switch in the downposition, hold for a moment and then release it.Result: The descent alarm should sound whenthe toggle switch is held down.CHECKLIST B PROCEDURES